Troubled Project Recovery – The First Steps

Troubled Project Recovery – The First Steps. *Developed and Presented By Jerry Perone, PMP *. 703-558-3198 jperone@esi-intl.com www.esi-intl.com. Objectives. To present On overview of the approaches to troubled projects and their recovery The critical first steps in the recovery process.

sven
Download Presentation

Troubled Project Recovery – The First Steps

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Troubled Project Recovery –The First Steps *Developed and Presented By Jerry Perone, PMP * 703-558-3198 jperone@esi-intl.com www.esi-intl.com

  2. Objectives To present • On overview of the approaches to troubled projects and their recovery • The critical first steps in the recovery process

  3. What is a Troubled Project? What is a Troubled Project? • Troubled: Variance trends have exceeded acceptable levels of tolerance; project is heading for failure • Project: A temporary endeavor undertaken to create a unique product, service, or result. • Recovery: To save from loss and restore to usefulness; prevent total failure

  4. When the Crisis Occurs Newtonian principles seem to apply: “a body in motion stays in motion unless . . .” • Troubled projects almost always occur towards the back end of the project life cycle. Project Begins Project Midpoint Crisis Occurs Project Deadline

  5. General Recovery Approaches • Only three fundamental approaches are available: • Change the scope • Increase productivity • Slip the schedule • Combining these however yields a fourth approach: • Change scope where possible, increase productivity as much as you can, and slip the schedule as necessary. The Triple Constraints

  6. Guiding Principles • Focus must be on the right issue • Regaining control is the priority • Do it with speed, accuracy, power, balance, focus • A time for project management basics.

  7. The First Steps….. • Assess the situation • How critical is the deadline • How willing is the customer to change scope • Determine each stakeholders’ “Win” needs • Prepare yourself to fix the project • Accept that the project is broken • Accept that you cannot fix it by doing the same things that you have been doing • Prepare all stakeholders for significant change

  8. The First Steps (cont.) • Ask the team what needs to be fixed • Be realistic • When recovery starts, admit you don’t know how long it will take to finish • Precisely identify • Current status - what is really “done” • Identify major threats, opportunities, and problems • Staffing and skills - “haves, needs” • Contractual obligations, penalties, liabilities

  9. The First Steps (cont.) • Focus work flow management via micro-management • Use miniature milestones (Inchstone) • Prioritize all work • Execute, monitor and control • Implement task by task labor tracking system • Re-calibrate after a short time • In parallel, begin re-baselining process • Plans - Identify all work which must be completed • Controls - Establish a comprehensive project control system

  10. Recovery – A Conceptual Overview

  11. Most Common Causes Observed • Work Breakdown Structure • Critical Path • Updating Actuals • Risk Management • Management Skills • A time for project management basics.

  12. Obstacles and Strategies • Sustaining progress while planning recovery • Additional temporary resources will be needed • Project Manager must direct current workflow plus affect the recovery • Pressure from stakeholders to commit to new schedule • Measured progress from Inchstones (miniature milestones) will help tremendously • Time is needed to determine work remaining • Estimating variance data is needed to make accurate forecast

  13. Obstacles and Strategies (Cont.) • Accurate assessment of project problems difficult for PM and team due to lack of objectivity • Use outside assessment team • Bring in technical specialists as required

  14. Overview of Rapid Assessment and Recovery Process

  15. ESI’s Rapid Assessment and Recovery of Troubled Projects

  16. Closing Remarks • Do not declare victory too soon • Sustained control is necessary • This is no time to go it alone • At first sign of any trouble, define problem and solution, alert stakeholders

  17. QUESTIONS???