10 likes | 113 Views
CYCLE FOR REPAIRING & REPLACEMENT OF TRANSFORMER. DTC BY JE9DIS) &JE(W/S). TO JE(DIST) DIVISION AGAINST PROPER INDENTS. DAMAGE T/F FROM SITE OF CONSUMER. DAMAGE T/F TO CTRW BY JE(D). REPAIRREL T/F HANDED OVER STAFF. JOINT INSP. OF T/F BY JE/DE (W/S) DE(S)D FIRMIS
E N D
CYCLE FOR REPAIRING & REPLACEMENT OF TRANSFORMER DTC BY JE9DIS) &JE(W/S) TO JE(DIST) DIVISION AGAINST PROPER INDENTS DAMAGE T/F FROM SITE OF CONSUMER DAMAGE T/F TO CTRW BY JE(D) REPAIRREL T/F HANDED OVER STAFF JOINT INSP. OF T/F BY JE/DE (W/S) DE(S)D FIRMIS REP. STAGE INSPECTION BY FIELD OFFICERS DEPUTED BY SE(S) FINAL INSPECTION AT FIRMIS WASTE BY OFFCERS OF STAFF&PVVNL REPAIRING IN FIRMIS AS PER ALLOTMENT BY SE(S) DAMAGE T/F CORE TANK WITHOUT OIL COIL TO REPAIR