Infrastructure @DESY status and plansAxel Matheisen DESY Overview on infrastructure @ DESY Infrastructure and up date/ grade Activities schedule
Overview on infrastructure @ DESY General Infrastructure of DESY covers all subjects for development, fabrication and preparation of super conduction cavities, optimized for 1.3 GHz cavities with up to 9 cell (Well know) • EB welding machine and machine shop • Heat treatment from 1400C to 120 C baking • Surface preparation by buffered chemical polishing (BCP) and electro-polishing (EP) bench • Clean room with high pressure rinsing, chemistry stand and cleaning equipment • Tuning lab • Small chemistry lab TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Overview on Infrastructure cont. TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Overview on Infrastructure cont. TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Infrastructure and up date/ gradeRe construction of cleanroom Outside view of the cleanroom Before TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Infrastructure and up date/ gradeRe construction of cleanroom In between TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Infrastructure and up date/ gradeRe construction of cleanroom • After re construction TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Infrastructure and up date/ gradeRe construction of cleanroom Clean room inside before TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Infrastructure and up date/ gradeRe construction of cleanroom Cleanroom inside during TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Infrastructure and up date/ gradeRe construction of cleanroom • And after re construction TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Infrastructure and up date/ gradeInstallation of a new 120 C baking oven outside view After Before TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Infrastructure and up date/ gradeInstallation of a new 120 C baking oven 120 C baking oven inside view (location ISO 4) TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Infrastructure and up date/ gradeTest of HPR 2 turbine with 20 nozzles Standard 8 nozzles 0. 4 mm ID~ 0,7 m3/hour Test 20 nozzles 0,4 mm ID ~ 2 m3/hour TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Infrastructure and up date/ gradeTest of HPR 2 turbine with 20 nozzles Pressure vs. time 8 Nozzles Standard treatment Pressure vs. time 20 Nozzles test run of 5.5 hours TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2
Activities schedule TTTC Meeting 2011 Milano 11.2.28 to 11.3.3 Axel Matheisen DESY Hamburg WG-2