1 / 25

Waypoint 2007 – Investigation and data issues

Waypoint 2007 – Investigation and data issues. Kym Bills Executive Director ATSB 30 August 2007. Multi-modal ATSB . ATSB.

swann
Download Presentation

Waypoint 2007 – Investigation and data issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Waypoint 2007 – Investigation and data issues Kym BillsExecutive Director ATSB30 August 2007

  2. Multi-modal ATSB

  3. ATSB • I was privileged to establish the ATSB on 1 July 1999 and to help build its international and national reputation in aviation and marine investigation, road safety, and increasingly rail investigation • Process review and cultural change takes time and since 2003 we have had solid legislation in place (currently being fine-tuned) and a nationally accredited diploma in transport safety investigation • 115 staff across 4 modes, most in aviation.

  4. Australian transport safety data • As in other OECD countries, most fatalities are on roads - crashes cost A$18b pa

  5. ATSB • Transport safety investigations are not intended to be the means to apportion blame or liability, in accordance with the Transport Safety Investigation Act 2003 and Annex 13 to the Chicago Convention • Powers to investigate, including to compel evidence even if incriminatory and reports/evidence can’t be used in courts • ATSB is part of DOTARS for administration and funding but separate from State bodies like Police and rail regulators, and federal bodies like the CASA & Airservices.

  6. SAFETY SYSTEM • Importantly, separate investigations by police, regulators and OHS bodies occur consistent with a ‘just culture’ (perhaps 10% of accidents include culpable actions) • The ATSB’s ‘no-blame’ safety investigation is only one part of the total safety system • ATSB mandatory occurrence reporting and voluntary confidential reporting, with data analysis and research, supplements both investigation & industry schemes (eg SMS).

  7. Aviation safety data • Fatal LCRPT accidents in 2000 (Whyalla) & 2005 (Lockhart River) but most accidents/fatals GA & trending as below:

  8. Aviation safety data • We continue to see many of the same types of fatal accident, eg:- controlled flight into terrain- weather (eg VFR into IFR conditions)- fuel exhaustion/starvation- hitting powerlines- high risk GA behaviour (eg low passes) • Human factors continue to dominate - management lack of awareness of human performance limitations remains an issue.

  9. Aviation safety data • The ATSB’s Australian Aviation Safety in Review covers 749 accidents 2001-2005 (mostly non-fatal; 2005 last data re hours) • 197 mechanical: 101 powerplant, 86 airframe, 10 aircraft systems accidents • 552 operational/handling: 197 collision type, 105 aircraft control, 74 hard landing, 34 wheels up, 32 fuel related accidents • In terms of phase of flight, 49% approach and landing; 21% take-off and initial climb.

  10. Safety data and investigation • May 2004 $6.3m Budget funding for a new Safety Investigation Information Management System (SIIMS) over 4 years • On time and under budget, we expect SIIMS to streamline electronic reporting • Also re-coding of historical data to enable research comparison and trend analysis • Expect increase in incident reporting to continue (c 8000 last FY) via safety culture • Choice of 80 investigations pa increasingly difficult, of which 30 are more detailed.

  11. ATSB business context – aviation SIIMS

  12. ATSB investigation • ATSB 500 page Lockhart River final report released on 4 April 2007 & refined our prior methodology & used SIIMS • ATSB also conducted a research study into instrument approaches • Considered all aspects of the aviation system which included organisational & regulatory issues as well as aircraft/crew • The ATSB methodology does not require findings against each layer if not found to be significant.

  13. ATSB investigation analysis

  14. Safety Investigation 200501977 Collision with Terrain 11 km NW Lockhart River Aerodrome 7 May 2005, RPT 2 crew/13 pax fatalities VH-TFU, SA227-DC (Metro)

  15. Lockhart River approach profile

  16. South Pap Accident site

  17. Safety factors and safety issues • ATSB investigations encourage safety action ahead of the final report with release of recommendations if necessary • Safety factors are events or conditions that increase safety risk • Safety issues are safety factors that have the potential to adversely affect the safety of future operations and are not just based on a specific individual’s behaviour – they are safety deficiencies requiring action.

  18. Contributing safety factors • Defined as a safety factor that, if it hadn’t occurred/existed … the accident would probably not have occurred … or another contributing safety factor would probably not have occurred or existed • Probably/likely >66% cf civil law test >50% • Evidence not sufficient for some (eg CRM) hence these are ‘other safety factors’ • Diagram shows 19 contributing safety factors (black border) and 13 of the 21 other safety factors (purple outline).

  19. The ‘acci-map’ diagram is built from the bottom up

  20. Issues and challenges • Using all available means to avoid a major accident is a primary challenge • This includes good safety management systems (SMS) among all key players • Understanding of the limits to human performance and organisational behaviour • Risk analysis, threat & error management • Helped by excellence in regulation, ATS ... • Learning from others, mindfulness of past lessons

  21. Issues and challenges • Striking the right balance between protecting safety data and legal systems • Getting the balance right between no-blame and culpability in a ‘just culture’ • Trade-off between investigation timeliness and thoroughness (eg with media and societal expectations - instant gratification) • The growing safety/security interface • Using tools/data like LOSA, FOQA etc and perhaps increasing commercial expertise • Reinforcing appropriate independence.

  22. Conclusion • Australia has a very safe transport system in international terms across all sectors • However, major accidents are low probability, high consequence events and we can never afford to be complacent • Systemic investigations remain crucial but pro-active reporting and data analysis also provide for evidence-based risk reduction • The ATSB will continue to work cooperatively with stakeholders to advance safety while maintaining necessary investigative independence.

  23. Thank you Questions?