An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. M II MCACES 2nd GENERATION Presenting Micro-Computer Aided Cost Estimating System (MCACES) 2nd Generation (MII)

  2. M II WHAT ISMII? One of the Tri-Services Automated Cost Engineering System (TRACES) suite of software tools. MII is the detailed cost estimating application used by the U. S. Army Corps of Engineers (USACE) and its A-E contractors for military, civil works and hazardous, toxic and radioactive waste (HTRW) projects.

  3. M II WHAT ISMII? Developed by Project Time & Cost, Inc. under contract with USACE, MII is the state-of-the-art replacement for MCACES and MCACES for Windows. First released in June 2003. Current version is 4.1 build 5. Version 4.2 will be available soon!

  4. M II MIIFeatures Estimates Are Organized in a Flexible User Defined Logical Tree Structure Number of WBS Levels is Unlimited User/Client Defined WBS Customizable to Fit Needs

  5. M II MIIFeatures (continued) Multiple Views of the Estimate are Available, Including: • Project Items • Contractors • CSI Tasks • Assemblies • Crews • Labor • Equipment

  6. M II MIIFeatures (continued) Highlighted Tree Element Details: Item List, Item Detail or Folder Detail

  7. M II MIIFeatures (continued) Highlighted Tree Element Details: Item List,Item Detailor Folder Detail

  8. M II MIIFeatures (continued) Highlighted Tree Element Details: Item List, Item Detail orFolder Detail

  9. M II MIIFeatures (continued) Any MII Library (Database) Can Be Opened As a Source Library and Items Easily Moved Into Project Library via Drag-Drop, Copy-Paste or Transfer

  10. M II MIIFeatures (continued) Unlimited Ability to Define Contractor, Subcontractor, Sub-Sub etc. Structure

  11. M II MIIFeatures (continued) Ability to Develop Detailed Field/Job Office Overhead Estimates

  12. M II MIIFeatures (continued) Ability to Define Payroll Tax and Insurance Rates by Contractor

  13. M II MIIFeatures (continued) Virtually Unlimited Ability to Define and Assign Contractor Markups

  14. M II Summary MII is a state-of-the-art cost engineering tool designed and developed by cost engineers for cost engineers. This overview was only a sampling of the sophisticated features of MII.

  15. M II Summary • Other key features include: • Import from MCACES & MFW • Quantity linking to and between folders and items to create logical relationships • Quantity linking to Excel workbooks • Create and use assemblies on the fly • Modeling capability using links to Excel • A powerful filtering tool expedites reviews and enhances quality control • And much, much more

  16. M II For More Information • Contact: • Project Time & Cost, Inc. • Jim Osborne • 770-444-9799 • jim.osborne@ptcinc.com