1 / 8

Building 867 Controlled facility for the repair of radiated material

Building 867 Controlled facility for the repair of radiated material. Betty Magnin TE-MPE-EM. RadWG 05/12/12. Building 867. The electronic repair workshop (867-R-P45). General purpose repair area TE-MPE-EM staff. Diagnostic and repair area All declared users.

sydnee
Download Presentation

Building 867 Controlled facility for the repair of radiated material

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building 867Controlledfacility for the repair of radiatedmaterial Betty Magnin TE-MPE-EM RadWG 05/12/12

  2. Building 867 The electronicrepairworkshop (867-R-P45) General purposerepair area TE-MPE-EM staff Diagnostic and repair area All declaredusers Betty Magnin TE-MPE-EM RadWG 05/12/12

  3. Building 867 Collectingrequirements of declaredusers Betty Magnin TE-MPE-EM RadWG 05/12/12

  4. Buiding 867 • Workbenches, shelves, drawersinstalled • Tooling, soldering irons, … delivered • IT installed • Safety inspection done, onlysomeminor points to befixed Current situation Installation into the workshop is possible Betty Magnin TE-MPE-EM RadWG 05/12/12

  5. Building 867 A typical user cell Betty Magnin TE-MPE-EM RadWG 05/12/12

  6. Building 867 • Done • Changingroomsinstalled • Hand/feet inspection available • Open points • No access control • No control for the materialat the entry/exit of the building • Someminor points (bins, suits, …) RP aspects The workshop is not classifiedyet, BUT… Betty Magnin TE-MPE-EM RadWG 05/12/12

  7. Building 867 • Installing test equipments • Testingelectronicsboards and modules • All non destructive works Whichactivitycanbedone ? Betty Magnin TE-MPE-EM RadWG 05/12/12

  8. Building 867 • Beforeany new installation, contact Angelito Hervé to clarifyspecific aspects. • To enter the workshop, contact TE-MPE-EM team (B. Magnin, R. Berberat or N. Wauquier) who have the key. • No activity possible during Christmas break. How to start ? Thankyou Betty Magnin TE-MPE-EM RadWG 05/12/12

More Related