Pre-Proposal Meeting January 16, 2008 US 95, Garwood to Sagle, Bonner County, Sagle KN 09781 US 95, SH-53 to Ohio Match Road, Kootenai CountyKN 011010
US 95, Garwood to Sagle, Bonner County, Sagle Project Overview Monarch Rd Dufort Rd • Approximate Project Limits – M.P. 465.3 to 469.75 • New four-lane highway with limited access • Frontage roads are planned on both sides of U.S. 95 • The Preliminary Design includes: • Limited Preliminary design for the new four-lane divided highway • TS&L for 3 Interchanges and 1 Underpass • Realignment of Railroad at the curve near M.P. 467 • Right-of-way plans and legal descriptions
US 95, Garwood to Sagle, Bonner County, Sagle Project Information Concept Report Draft Environmental Document Preliminary Mapping Preliminary Total Ownership Map Draft Phase 1 Report Conceptual DEIS Plan View
IS&T for US 95, SH-53 to Ohio Match Road, KN 011010 • Project Background • 4 Lane Divided Highway • No major structures • Estimated start of construction June ’08 • Completion anticipated to be End of ‘09 • Includes winter shutdown • Requirements • Idaho Inspector Qualification Program • WAQTC qualified • Environmental Inspection • Comply with Consent Decree • Field Rates must be approved by ITD • ITD has first right of refusal to any and all IS&T
IS&T for US 95, SH-53 to Ohio Match Road, KN 011010 Anticipated Quantities: Project Length: 3 Miles Borrow: 98,500 CY Aggregate Base: 233,000 Tons Pipe Culvert: 1,000 Feet Traffic Signals: 2 Superpave HMA: 71,000 Tons