Pre-Proposal Meeting January 16, 2008

Pre-Proposal Meeting January 16, 2008. US 95, Garwood to Sagle, Bonner County, Sagle KN 09781. US 95, SH-53 to Ohio Match Road, Kootenai County KN 011010. GARVEE Transportation Program Overview. US 95, Garwood to Sagle, Bonner County, Sagle.

Download Presentation

Pre-Proposal Meeting January 16, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pre-Proposal Meeting January 16, 2008 US 95, Garwood to Sagle, Bonner County, Sagle KN 09781 US 95, SH-53 to Ohio Match Road, Kootenai CountyKN 011010

  2. GARVEE Transportation Program Overview

  3. US 95, Garwood to Sagle, Bonner County, Sagle

  4. US 95, Garwood to Sagle, Bonner County, Sagle

  5. US 95, Garwood to Sagle, Bonner County, Sagle Project Overview Monarch Rd Dufort Rd • Approximate Project Limits – M.P. 465.3 to 469.75 • New four-lane highway with limited access • Frontage roads are planned on both sides of U.S. 95 • The Preliminary Design includes: • Limited Preliminary design for the new four-lane divided highway • TS&L for 3 Interchanges and 1 Underpass • Realignment of Railroad at the curve near M.P. 467 • Right-of-way plans and legal descriptions

  6. US 95, Garwood to Sagle, Bonner County, Sagle Project Information Concept Report Draft Environmental Document Preliminary Mapping Preliminary Total Ownership Map Draft Phase 1 Report Conceptual DEIS Plan View

  7. IS&T for US 95, SH-53 to Ohio Match Road, KN 011010 • Project Background • 4 Lane Divided Highway • No major structures • Estimated start of construction June ’08 • Completion anticipated to be End of ‘09 • Includes winter shutdown • Requirements • Idaho Inspector Qualification Program • WAQTC qualified • Environmental Inspection • Comply with Consent Decree • Field Rates must be approved by ITD • ITD has first right of refusal to any and all IS&T

  8. IS&T for US 95, SH-53 to Ohio Match Road, KN 011010 Anticipated Quantities: Project Length: 3 Miles Borrow: 98,500 CY Aggregate Base: 233,000 Tons Pipe Culvert: 1,000 Feet Traffic Signals: 2 Superpave HMA: 71,000 Tons

  9. US 95, Garwood to Sagle Questions