1 / 20

Turning research into real systems The role of Validation and the E-OCVM

Turning research into real systems The role of Validation and the E-OCVM. Nigel Makins EUROCONTROL nigel.makins@eurocontrol.int. Overview. Overview of European R&D structure Overview of European R&D Validation methodology

syshe
Download Presentation

Turning research into real systems The role of Validation and the E-OCVM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Turning research into real systemsThe role of Validation and the E-OCVM Nigel Makins EUROCONTROL nigel.makins@eurocontrol.int

  2. Overview • Overview of European R&D structure • Overview of European R&D Validation methodology • Key areas that R&D needs to address in order to turn research into reality • Scope is ATM Research & Development • Its about ensuring that research supports procurement • Its about using research to answer the stakeholders question ‘Are we building the right system’

  3. Eurocontrol (38) EU (27) ECAC (42) Europe XX IS FI • Massive expansion of European Union (EU) and EUROCONTROL in 90’s • EU expands to 27 members - able now to make law and set rules and mandates • 2001 - Single European Sky (SES) initiative to re-organise European Air Traffic Management • 2004 – SESATM Research (SESAR) programme start – with Definition phase • Definition phase sets out working methods incl Validation. • 2008 – SESARJoint Undertaking (SJU) formed to manage the 2.1 billion Euro Development phase of SESAR RU Nov 9th 1989 SE NO EE LV DK LT IE BY KZ GB PL NL BE UA DE CZ LU SK MD AT HU FR CH GE RO AZ SI HR AM BA SR IR BG IT CG PT MK TR ES AL GR IQ SY CY DZ MT TN MA

  4. Implementation Development work ATM System SESAR – R&D 2005 2010 2015 2020  SESAR Phases Definition Development Deployment SESAR Joint Undertaking 2005 2010 2015 2020

  5. IP1 IP3 IP2 2009 2013 2017 2020 2025 SESAR Implementation 3 Implementation Packages • Each individual Air Traffic Service Provider (ANSP) will manage own procurement to comply with SESAR expectations • EUROCONROL 38 member states of which 27 EU. • Need clear processes. • Validation methodology one of those processes • Now embedded in SESAR System Engineering Methodology

  6. From a dream to reality The dream! Research determines the new transport capability (elephant) To build that dream many ‘specialists’ are needed Different ‘specialists’ describe the various parts of this new system so that it can be built

  7. a collection of parts The build Result of not having a shared vision !! R&D must build a shared vision of the future. This is what the European Operational Concept Validation Methodology sets out to do.

  8. Validation during R&D • European methodology is based on the belief that stakeholder’s must be consulted through the R&D phases • Only way to get agreement about are we building the right system • The concept will change as it develops • Validation criteria not easy to determine during these phases • Validation during research and early development is an iterative consultation process to build a shared vision.

  9. European Ops Concept Validation Methodology -E-OCVM Three parts to the methodology • Lifecycle • Structured Planning checklist • Cases. Following slides more detail on each part

  10. R&D E-OCVM Scope V1 V2 V3 V0 V4 V5 V6 V7 1 - Life cycle De-commissioning Deployment Performance needs Industrialisation Operations Integration Scope Feasibility This life cycle has been adopted by SESAR Master Planning

  11. V1 V2 V3 V0 V4 V5 V6 V7 2 - Structured Planning • Acts as a check list of what to do • Provides structure to contracts for validation projects • Applied to each R&D phase

  12. Performance driven Understand the problem What is stopping the current system from delivering better performance Understand the solution What is the performance expectation What is the benefit mechanism How can improvements be measured Create a strategy to develop and test the solution Ensure show-stopping issues identified early e.g. need for; • Technical standards • Safety regulatory tests • SARPS (ICAO Operational procedures)

  13. Concept description Validation strategy Exercise objectives Exercise Results as expected? Learning from research Re-consider solution Revisit strategy Revisit exercise plan Results Feedback from research is essential to ensure we get what we expect

  14. Business Case Environmental Case Safety Case (for R&D) Safety Case Human Performance Case Standards Case Performance needs Regulations Case Deployment Industrialisation Operations De-commission V1 V2 V3 V0 V4 V5 V6 V7 Scope Feasibility Integration 3 - Cases Packaging the evidence to support stakeholders decisions R&D E-OCVM Scope

  15. A process Three parts A process that follows the lifecycle phases Performance driven Interactive with stakeholders & Evidence dependant

  16. End of V3 = TRL 6 End of V5 = TRL 8 Interface with SESAR Industrial partners E-OCVM V6 V1 V2 V3 V4 V5 Procedures deployed Ops Procedure & Requirements draft Procedures approved Concept, scope Mature procedures Costs, benefits and performance Mock-up simulation First dev. std Function certified Certif. dev. std prototypes 2 3 4 5 6 7 8 9 NASA TRL R & D phases Development phases In service phase

  17. Regulations to standards Community specifications are standards or specifications covering technical and operational issue. They are • Fundamental to building the system described during R&D, & • Important aspect of the R&D validation strategy

  18. Standards milestones OSED - Ops Services &Environment description - key document linking concept to technical description Safety & Performance requirements Interoperability requirements Community Specifications. ICAO Standards & recommended practices Minimum operational performance standards

  19. Turning research into reality by building consensus Building a shared vision based on evidence is critical in turning research into reality. Validation during R&D is getting buy-in from key stakeholders • operational staff, • airspace users, • technology supply industry, • regulators Making sure ‘we are building the right system’

  20. QuestionsFor info.google search worde-ocvm

More Related