80 likes | 177 Views
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab
E N D
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation • In Slide Show, click on the right mouse button • Select “Meeting Minder” • Select the “Action Items” tab • Type in action items as they come up • Click OK to dismiss this box • This will automatically create an Action Item slide at the end of your presentation with your points entered. Station Report in Zimbabwe Shumba Blessing T
Zimbabwe Seismic Network • The four stations : Kri, Mtd, Byo, Cir produced analog recordings up to 1993 when the stations ceased operating. • Implying that from 1993 to 2003 when Matp station was opened, there was no monitoring. • Matp station has been operating since 2003 as a single three component station.
Additional Seismic Stations installed after 2000 • 2 africa array seimic stations • HARE • BLWY • Data Collection from Africa Array stations • Collection of data is not real time but is done once a month. • CTBTO – Auxiliary seismic station • MATP • Data Collection from CTBTO station • Data is obtained in real time
The 15meter tunnel was excavated inside this mountain The IMS Facility • ● The site is within the National Park premises. • ● The entrance to the tunnel is kept secured at all times. Access to the tunnel is possible only with personnel from NDC
The Underground Office This is a self contained office with the required equipment housed in this 15metre 3- compartment office. ● The satellite dish and the generator are behind the mountain.
Vsat at Goetz ( National Data Centre) Vsat at MATP seismic site