GMS ( General Management & Safety ) Group Meeting. 26-Mar-10. Agenda. Group objectives 2010 ( S. Prodon ) Safety coordination ( J. Etheridge ) Safety inspections ( C. Bernard ) Presentation of the AET - Avis d’Exécution de Travaux ( S. Grillot )
E N D
Agenda • Group objectives 2010 (S. Prodon) • Safety coordination (J. Etheridge) • Safety inspections (C. Bernard) • Presentation of the AET - Avis d’Exécution de Travaux (S. Grillot) • Safety in EN department (J. Pedersen) • Tour de table : main activities of each group member
Group Structure R. Som E. Delachenal P. Barriere A.F. Carrichon E. Cochet M. Claret F. Girard-Madoux G. Jean P. Henry C. Paris P-Y. Buisson L. Colly D. Gonnard C. Pinto Post 2009-300-LD G. kijko V. Jeziorek G. Fontana
Group structure • Departures • C. Alliod (STAFF) – 31.12.2009 • I. Pedroso Izquierdo (UPAS) – 15.01.2010 • Arrivals • P. Barriere (STAFF) – 01.01.2010 • G. Fontana (TEMP) – 22.02.2010 • O. Tison (STAFF) – 01.05.2010
Group Objectives • Administration • Reception of newcomers • Information transmission to group secretaries • MARS & advancement follow-up • Recruitment follow-up (30 posts opened end 2009) Work axis: exchanges with secretariat
Group Objectives • Secretariat • New replacement organisation (binomes) • Exchanges between secretaries & with DAO office • Sharing of procedures, templates & documents (collaboration Web site) • New positioning according to group leaders’ needs Work axis: Exchanges & replacement organisation
Group Objectives • Specifications & contracts • Publication of EN purchase procedure • Dissemination of information in the groups • Implementation of a call for tender and contacts follow-up database • Follow-up of contacts with contract engineers Work axis: purchase procedure & information
Group Objectives • Safety Inspections Service • Organisation of machine tools inspections • Report dispatching for electrical safety inspections • Integration of new electrical safety inspector • Web interface for safety inspections statistics • Liaison with DSOs, DGS and main equipment owners • Safety improvement actions Work axis: safety inspections organisation & communication
Group Objectives • Safety Coordination • Implication as from the conception phase for future projects • Revision of the mandate (with DSOs & DGS) • Preparation of procedures for technical stops and shut-downs • Sharing of information (collaboration workspace) Work axis: conception phase & mandate
Group Objectives • DPO office • Implementation of a new service • Preparation of MTP 2010 • Recruitments (30 open posts) • LD to IC exercises (46 IC posts) • Definition of budget follow-up indicators Work axis: new service & MTP 2010