1 / 11

GMS ( General Management & Safety ) Group Meeting

GMS ( General Management & Safety ) Group Meeting. 26-Mar-10. Agenda. Group objectives 2010 ( S. Prodon ) Safety coordination ( J. Etheridge ) Safety inspections ( C. Bernard ) Presentation of the AET - Avis d’Exécution de Travaux ( S. Grillot )

taini
Download Presentation

GMS ( General Management & Safety ) Group Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GMS (General Management & Safety) Group Meeting 26-Mar-10

  2. Agenda • Group objectives 2010 (S. Prodon) • Safety coordination (J. Etheridge) • Safety inspections (C. Bernard) • Presentation of the AET - Avis d’Exécution de Travaux (S. Grillot) • Safety in EN department (J. Pedersen) • Tour de table : main activities of each group member

  3. Group Structure R. Som E. Delachenal P. Barriere A.F. Carrichon E. Cochet M. Claret F. Girard-Madoux G. Jean P. Henry C. Paris P-Y. Buisson L. Colly D. Gonnard C. Pinto Post 2009-300-LD G. kijko V. Jeziorek G. Fontana

  4. Group structure • Departures • C. Alliod (STAFF) – 31.12.2009 • I. Pedroso Izquierdo (UPAS) – 15.01.2010 • Arrivals • P. Barriere (STAFF) – 01.01.2010 • G. Fontana (TEMP) – 22.02.2010 • O. Tison (STAFF) – 01.05.2010

  5. Group Objectives • Administration • Reception of newcomers • Information transmission to group secretaries • MARS & advancement follow-up • Recruitment follow-up (30 posts opened end 2009) Work axis: exchanges with secretariat

  6. Group Objectives • Secretariat • New replacement organisation (binomes) • Exchanges between secretaries & with DAO office • Sharing of procedures, templates & documents (collaboration Web site) • New positioning according to group leaders’ needs Work axis: Exchanges & replacement organisation

  7. Group Objectives • Specifications & contracts • Publication of EN purchase procedure • Dissemination of information in the groups • Implementation of a call for tender and contacts follow-up database • Follow-up of contacts with contract engineers Work axis: purchase procedure & information

  8. Group Objectives • Safety Inspections Service • Organisation of machine tools inspections • Report dispatching for electrical safety inspections • Integration of new electrical safety inspector • Web interface for safety inspections statistics • Liaison with DSOs, DGS and main equipment owners • Safety improvement actions Work axis: safety inspections organisation & communication

  9. Group Objectives • Safety Coordination • Implication as from the conception phase for future projects • Revision of the mandate (with DSOs & DGS) • Preparation of procedures for technical stops and shut-downs • Sharing of information (collaboration workspace) Work axis: conception phase & mandate

  10. Group Objectives • DPO office • Implementation of a new service • Preparation of MTP 2010 • Recruitments (30 open posts) • LD to IC exercises (46 IC posts) • Definition of budget follow-up indicators Work axis: new service & MTP 2010

  11. Next

More Related