410 likes | 555 Views
Company House 3, Skejby. Bygherre: C.W.Obel Ejendomme A/S – Kim Freilev. Auditor: Frank Skov Jensen – NCC Property Development. Stand-in: Nikolaj Hertel – NCC Property Development. Company House Skejby. Guld – 80%. Sølv – 65%. Bronze – 50%. Company House Skejby. 79,1.
E N D
Company House 3, Skejby Bygherre: C.W.Obel Ejendomme A/S – Kim Freilev Auditor: Frank Skov Jensen – NCC Property Development Stand-in: Nikolaj Hertel – NCC Property Development
Company House Skejby Guld – 80% Sølv – 65% Bronze – 50% 1. November 2012
Company House Skejby 79,1 86,4 55,7 60,4 55,9 68,9 63,9 Guld – 80% Sølv – 65% Bronze – 50% 1. November 2012
Afprøvning af LEED, BREEAM, DGNB og HQEAfprøvet i januar til april 2010 Horten • 8800 m2 kontor bygning • Ibrugtagning: Nov. 2009 Company house • 6000 m2 kontor bygning • Ibrugtagning: Efterår 2009 1. November 2012
DGNB International – afprøvningCompany House Vallensbæk 1. November 2012
Company House og DGNB 1. November 2012
Vurdering af kvalitet 1. November 2012
Miljømæssig kvalitet Livscyklusvurdering - LCA Materialer – Toxiciteter – Certificeret træ Vandforbrug Arealanvendelse 22.5% X 22.5% 22.5% 22.5% 10% 100% 1. November 2012
Miljømæssig kvalitet – 79,1% 1 Drivhuseffekt ( 9 af 10 point) 2 Nedbrydning af ozonlaget ( 4 af 10 point) 3 Fotokemisk ozondannelse (10 af 10 point) 4 Forsuring (10 af 10 point) 5 Næringssaltbelastning (10 af 10 point) 6 Materialer og deres toksiske egenskaber (ej med i pilot) 8 Brug af certificeret træ ( 5 af 10 point) 10 Energy – ikke fornyelige ressourcer (10 af 10 point) 11 Energy – total primærenergi og fornyelig energi (10 af 10 point) 14 Drikkevands- og spildevandsmængder ( 9 af 10 point) 15 Arealanvendelse ( 0 af 10 point) (uofficiel oversættelse af kriterierne til dansk)
LCA i DGNB • 13% afhelecertificeringen • 7 kriterierevalueret • 1 Drivhuseffekt • 2 Nedbrydning af ozonlaget • 3 Fotokemisk ozondannelse • 4 Forsuring • 5 Næringssaltbelastning • 10 Energy – ikke fornyelige ressourcer • 11 Energy – total primærenergi og fornyelig energi
LCA - INPUT Miljødeklarationer (EPD)
Drivhuseffekt – Carbonfootprint 7.460.000 kg CO2 for bygningen i 50 år ELLER 22,4 kg CO2/m2/år • 6,38 kg CO2/m2/år pga. materialeforbrug • 16,1 kg CO2/m2/år pga. el og varme
Fordeling Materialer: 26% El og varme: 74%
Hvad betyder det? Company House: • Fornuftigt materialevalg til bygningen • Lavt energiforbrug, lavere end de lovmæssige krav = gode LCA resultater
Økonomisk kvalitet X 22.5% Totaløkonomi - LCC Fleksibilitet overfor 3dje parts brug 22.5% 22.5% 22.5% 10% 100% 1. November 2012
Economic quality criteria – 86,4% 16 Totaløkonomi (9 af 10 point) 17 Fleksibilitet overfor 3dje parts brug (10 af 10 point) (uofficiel oversættelse af kriterierne til dansk)
Social kvalitet Indeklima Tilgængelighed Udearealer Forhold for cyklister Sikkerhed Arkitektur: Konkurrence og kunst 22.5% X 22.5% 22.5% 22.5% 10% 100% 1. November 2012
Social quality criteria – 55,7% Health, comfort, and user satisfaction 18 Termisk komfort vinter (9 af 10) 19 Termisk komfort sommer (9 af 10) 20 Luftkvalitet (10 af10 point) 21 Akustik (3 af 10 point) 22 Visuel komfort (4 af 10 point) 23 Brugerindflydelse (4 af 10 point) 24 Udearealernes kvalitet (4 af 10 point) 25 Sikkerhed (4 af 10 point)
Social quality criteria – 55,7% Functionality 26 Tilgængelighed (1 af 10 point) 27 Arealeffektivitet (9 af 10 point) 28 Mulighed for ændringer (7 af 10 point) 29 Offentlig adgang (5 af 10 point) 30 Forhold for cyklister (7 af 10 point) Aestheticquality 31 Designkonkurrence (1 af 10 point) 32 Bygningsintegreret kunst (0 af 10 point) (uofficiel oversættelse af kriterierne til dansk)
Teknisk kvalitet Brandsikkerhed Klimaskærm Rengøring og vedligeholdelse Lydisolering Genanvendelse af byggematerialer 22.5% 22.5% 22.5% 22.5% X 10% 100% 1. November 2012
Technical Quality – 60,4% 33 Fire safety(5 af 10 point) 34 Sound insulation(7,5 af 10 point) 35 Building envelopequality(7 af 10 point) 40 Ease of buildingcleaning and maintenance(6 af 10 point) 42 Ease of dismantling and recycling(5 af 10 point) 1. November 2012
Procesmæssig kvalitet Projektstyring Forundersøgelser Bæredygtighed i udbud Kvalifikation af designholdet Byggepladsen Commissioning 22.5% 22.5% 22.5% 22.5% 10% 100% X 1. November 2012
Process quality criteria – 55,9% Comprehensive project definition (4 af 10) Integrated planning (6 af 10) Comprehensive building design (4 af 10) Sustainability aspects in tender phase (2 af 10) Documentation for Facility Management (10 af 10) Environmental impact of construction site / construction process (3 af 10) Prequalification of contractors (10 af 10) Construction quality assurance (5 af 10) Systematic commissioning (7.5 af 10)
DGNB kriterier – Områdets kvalitet – 63,9% Risikovurdering vedr. naturkatastrofer mv. Image Offentlig transport Adgang til forskellig service Tilgængelighed 22.5% 22.5% 22.5% 22.5% 10% 100% X 1. November 2012
Afsluttende bemærkninger What’s in it for me? 1. November 2012
Umiddelbarefordeleved DGNB Certificering For Investorer • Gennemsigtig og uafhængig kvalitetsmærke • International anvendelighed og sammenlignelighed • Planlægnings sikkerhed og klar definition af mål fra starten • Risikominimering • Øget markedspotentiale med stigende efterspørgsel • Dokumentation for CSR-rapporter og CO2regnskab • Fremtidssikret bygninger / længere kommerciel holdbarhed
Umiddelbarefordeleved DGNB Certificering For lejere og brugere • Lavere driftsomkostninger • Højere brugertilfredshed • Højere produktivitet hos medarbejderne • Mindre sygefravær • Inkorporering af bygninger og faciliteter i strategier for markedsføring • Dokumentation for CSR-rapporter og CO2 regnskab • Frivillig engagement gennem corporate governance
Sustainable Building is Worth It! Roland Berger: “Sustainability in Real Estate Management”, 2010 • Up to 4% higher rents • Proportion of certified buildings in real estate portfolios will grow by 18% in the coming years • Building certification will become more and more important as a value driver in the coming years Prof. UweRotermund: “FM Benchmarking Report”, 2010/2011 • Erection costs in the “Structure” and “Building Systems” cost groups lie well below those of uncertified buildings
Sustainable Building is Worth It! Drees + Sommer Report: “Additional Costs of Certified Buildings” • Only about 0 to 4% additional construction costs for DGNB Certified buildings (LEED: up to 7%) • Less than 0.5% additional planning and consulting costs for DGNB Certified buildings Jones Lang LaSalle: „Offices 2020“ • 83% of real-estate professionals think sustainability is a top priority for office real estate over the next decade Sustainable Building is a value driver – not a cost driver!
Fastighetsvärlden (June 2012) The sweet-spot of the market… 1. November 2012
Premium values • BREEAM certified office buildings in London 2000-2009 • Longer tenant contracts and fewer vacancies • Rents + 21% • Transaction prices + 19% • Premiums fall when the supply increases • Similar development in the US • Soruce: Maastricht University (2012) ”Supply, Demand and the Value of • Green Buildings” 1. November 2012
Opsummering • Certificerede bygninger opnår højere leje • Certificerede bygninger har højere udlejningsgrad • Certificerede bygninger har lavere driftsudgifter • Certificerede bygninger får højere m2-priser • Certificerede bygninger bliver ikke utidssvarende • Det er rigtigt at udvikle, bygge og drive • certificeret byggeri 1. November 2012