240 likes | 341 Views
PET Year 1 Review EOTC. Susan T. Brown, Ph.D. OSC 14 May 2002. Top Priorities: Provide training, when & where needed Impact workforce pipeline Integrate MSIs in PET activities Tactical Strategy: Streamline training coordination through OKC Set up persistent analysis of user needs
E N D
PET Year 1 ReviewEOTC Susan T. Brown, Ph.D. OSC 14 May 2002
Top Priorities: Provide training, when & where needed Impact workforce pipeline Integrate MSIs in PET activities Tactical Strategy: Streamline training coordination through OKC Set up persistent analysis of user needs Increase graduate level PET participation Implement effective and streamlined Summer Intern Program Implement MSI Visiting Faculty Program EOTC Technical OverviewOverview of EOTC Strategy Contract Year 1 Review
EOTC Technical Overview (1) • Overview of Efforts for Year 1 • Training Registration • Currently, registration local at each Component, Soon to be implemented in OKC, Standard registration form developed for OKC • Training Schedule • Current schedule kept at ERDC by Technologist, Posted on ERDC web site, Eventually to be implemented in OKC • Training Content - Generated by FAPOCs, based on user demand • 4 CE courses at 4 different locations (Component 1) • 1 ET course, 1 SIP course (Component 2) • 5 CFD courses at 3 locations, 2 EOTC seminar series (Component 3) • 3 CCM courses at 2 locations, 1 CEN course, 1 CEA course (Component 4) Contract Year 1 Review
EOTC Technical Overview (2) • Overview of Efforts for Year 1 • 6 of the 18 Summer Interns for Components 1, 2, 3 for Summer 2002 are grad students (Selection pending for Component 4) • Summer Intern Program • 3 components centralized this contract year • Goal is to include the 4th component in the centralized system next contract year. • OKC staff working with Component Technologists to develop and implement Training Registration Wizard • User requirements • Survey results for 2002 • BoFs planned for UGC and SC02 Contract Year 1 Review
EOTC Technical Overview (3) • Overview of Efforts for Year 1 • MSI program • 5 of the 18 Summer Interns at Components 1, 2, 3 for Summer 2002 are from MSIs • Selection Pending for Component 4 • JSU: Working with Dr. Willie Brown on reduced scope proposal, Summer Institute in core • CAU: 2 proposals requested for next contract year, Visiting Faculty proposed for next contract year, Graduate student Assistance • FIU: Working with them for next year’s proposal process; Assisted in OKC development • UH: Tailoring program to meet PET needs • CSU: Presentation at ASC, Workshop planned June 7, 2002 • HPTi (other MSIs): UTEP included in CE project Contract Year 1 Review
User Codes Impacted by PET Will begin this contract year to ask the question specifically. Several of those who took Advanced MPI said they would use some of the calls they learned in their codes – but codes were generally not named. Parallel Methods helped high resolution wave propagation models Parallel Processing Techniques will be applied in student projects in large scale computing in solid mechanics and materials Knowledge will be used “immediately and often” Technical (Metrics) Contract Year 1 Review
User Contacts and Assistance Component 1 CE – MPI at ASC. 11 users x 16 hours = 176 contact hours CE - Advanced MPI at ARL. 14 users x 14 hours = 196 contact hours CE – Cross-Platform Performance Analysis Tools at ERDC. 7 users x 16 hours = 112 contact hours CE – C Programming at AEDC. 19 users x 24 hours = 456 contact hours Component 2 ET – EnVis at ERDC. 6 users x 8 hours = 48 contact hours SIP – Introductory MATLAB at ASC. 22 users x 16 hours = 352 contact hours Technical (Metrics) Contract Year 1 Review
Technical (Metrics) • User Contacts and Assistance • Component 3 • EOTC – PET Frontier Lectures at ARL. 50 users x 4.5 hours = 225 contact hours • CFD – Seminar at ARL. 9 users x 1.5 hours = 13.5 contact hours • CFD – CAD Interface and Meshing workshop at ARL. 8 users x 21 hours = 168 contact hours • CFD – Advanced Gridgen at ARL. 12 users x 14 hours = 168 contact hours • EOTC – Features of the Compaq Alphaserver at ERDC. 11 users x 16 hours = 176 contact hours • CFD – Introduction to CFD++ at NSWC. 14 users x 24 hours = 336 contact hours • CFD – GASP workshop at ASC. 7 users x 8 hours = 56 contact hours Contract Year 1 Review
Technical (Metrics) • User Contacts and Assistance • Component 4 • CCM – Advanced Solid-State Modeling at ARL. 9 users x 7 hours = 63 contact hours • CEN – Circuit Solvers and Optimizers at ARL. 3 users x 6 hours = 18 contact hours • CCM – Computing workshop at ARL. 17 users x 14 hours = 238 contact hours • CCM – MSI/Accelrys Seminar at ASC. 7 users x 4 hours = 28 contact hours • CEA – SWITCH Workshop at ASC. 20 users x 16 hours = 320 contact hours Contract Year 1 Review
Tools introduced to community Gridgen, 17-18 April 2002 at ARL EnVis (Environmental Visualization Environment), 8 February 2002 at ERDC Cross-Platform Performance Analysis Tools, 19 – 20 March 2002 at ERDC MATLAB, 24 – 25 January 2002 at ASC MSI/Accelrys, 5 February 2002 at ASC SWITCH, 7 – 8 March 2002 at ASC GASP, 27 March at ASC Technical (Metrics) Contract Year 1 Review
Presentations Central State visit to ASC Conferences MSI BOF at SC2001 Workshops CCM Advanced Parallel Computing, Apr 2002 ICEM CFD CAD Interface and Meshing, Feb 2002 GASP (Version 4), Mar 2002 SWITCH, Mar 2002 Seminars MSI/Accelrys, Feb 2002 CFD Seminar, Dec 2001 PET Frontier Lectures, Mar 2002 Technical (Metrics) Contract Year 1 Review
Training CCM Modeling, Jan 2002 Advanced MPI, Mar 2002 Circuit Solvers and Optimizers, Mar 2002 Advanced Gridgen, Apr 2002 Features of Compaq Alphaserver, Jan 2002 EnVis Short Course, Feb 2002 Cross-Platform Performance Analysis Tools, Mar 2002 Introduction to CFD++, Mar 2002 C Programming, Mar 2002 MPI, Jan 2002 Introductory MATLAB, Jan 2002 Technical (Metrics) Contract Year 1 Review
Technical Reports and Articles None to date Will summarize User Requirements Will summarize User Evaluations Next year Training Plans Vendor courses FA training plan Technical (Metrics) Contract Year 1 Review
FA Training Plan • CFD • UGC Tutorials • Current Trends in Computational Fluid-Structure Interactions (with CSM) Workshop • CFD Validation & Verification Workshop • Interprogramming Languages Course • Parallel Programming Techniques in CFD • Overset Technology & OVERFLOW-D Training • CDLT • CDLT Tools and Technologies • OKC • Use of OKC for Support Staff and Portal Developers • Use of OKC for Content Developers • OKC Technologies Contract Year 1 Review
FA Training Plan • EQM • Workshop on Mathematical, Algorithmic and Computer Science Issues in Multiphysics Couplings • Workshop on Discontinuous Galerkin Methods and A Posteriori Error Estimation • CCM • PET/CHSSI Workshop • Advanced Drug Discovery Methods • Advanced solid-state modeling (molecular dynamics) • Advanced pharmacophore design and analysis • Biomolecular modeling From Homology Modeling Through Genomics and Proteomics - Theory and HPC Applications (Seminar Series) • Multi-phase molecular dynamics simulations • Transition state modeling (for biomolecular systems) • Electrochemical Modeling (i.e. Batteries) Workshop • QChem Contract Year 1 Review
FA Training Plan • CE • Intermediate UNIX • Mixed-Mode Parallel Programming • MPI Programming • Features of Alpha Server System • Vector Tuning • Cross-platform Performance Analysis Tools • Dense and Sparse Linear Algebra Libraries • Advanced MPI • Performance optimization for HPC architectures • Debugging Parallel Code • C++ Programming • FMS • Parallelization of Entity-Based Simulations Contract Year 1 Review
FA Training Plan • IMT • Principles of Data Warehousing and Data Mining • Distributed Services and Object Protocols • SIP • Introduction to MATLAB • Advanced MATLAB Programming • Simulink • Signal/Image Processing • Signal Mining • SIP/CEA/CEN Workshop • CEN • Use of Time Domain Techniques to Solving High-Frequency Circuit Problems • Joint CEA/CEN/SIP Forum • Efficient Computational Methods for Circuits and Antennas Contract Year 1 Review
FA Training Plan • CSM • CFD-CSM Joint Fluid-Structure Interaction • Theory & Implementation of ALE Algorithms • ET • Grid Generation & Grid Technology • CWO • Comprehensive Introduction to Scientific Visualization for CWO Research • Making CWO Codes Portable and Efficient • CEA • Joint CEA/CEN/SIP Forum • The Characterization of Propagation Channels • Efficient Computational Methods for Circuits and Antennas Contract Year 1 Review
Staffing • FAPOC • Institution not on contract – withdrew Dec 2001 • Replaced 1 January 2002 • Technologists • Component 1 continued from PET 1 (Brian Tabor) • Component 2 continued from PET 1 (Mason Colbert) • Component 3 hired March 2002 (Reginald Liddell) • Component 4 officially unresolved, but practically continuing from PET 1 (Jennifer Moses) Contract Year 1 Review
Summary • MSI active participation still problematic • MOU for technologist duties with HPTi unsuccessful to date Contract Year 1 Review
Core Financial Summary (OSC) Contract Year 1 Review
Backup Contract Year 1 Review
Vendor Training Courses for the period June 2002 through May 2003 Training Course Vendor Location FA iSIGHT Engineous Software ARL ET OneSAF Sagacitec Redstone FMS HLA AEgis Technologies ASC FMS EnSight Computational Engineering International ERDC/NAVO ET AVS Advanced Visual Systems, Inc. ASC ET VTK Kitware, Inc. NAVO ET ICEM ICEM CFD Engineering ASC ET GRIDGEN Pointwise, Inc. AEDC ET/CFD ZAPOTEC Sandia Labs. ERDC CSM SEDRIS AEgis Technologies NAVO FMS ANSYS ANSYS, Inc. ASC CSM DADS LMS North America TARDEC IMT ADAMS Mechanical Dynamics TARDEC IMT LS-Dyna Muliphysics Simulation Engineering ARL CSM OVERFLOW TBD ARL CFD Matlab/RTExpress Mathematical Analysis Company ERDC CE Backup Contract Year 1 Review
Backup • UAP members • Matt Grismer • Dean Hampton • Laura Bobo • Jeanie Osburn Contract Year 1 Review