Franks Tract Pilot Project

Franks Tract Pilot Project. Don Kurosaka, DWR Ajay Goyal, DWR. Agenda. Background Information Pilot Project Alternatives WQ Modeling Studies Fish Studies Project Schedule Funding Options. Flooded Island Feasibility Study. Identified WQ Improvement Potential

tallis
Download Presentation

Franks Tract Pilot Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Franks TractPilot Project Don Kurosaka, DWR Ajay Goyal, DWR

  2. Agenda • Background Information • Pilot Project Alternatives • WQ Modeling Studies • Fish Studies • Project Schedule • Funding Options

  3. Flooded Island Feasibility Study • Identified WQ Improvement Potential • Evaluated Several Alternatives for benefits to: • Water Quality • Ecosystem • Recreation • Recommendations • Pilot Project to Confirm Benefits • Refine Alternatives

  4. Follow-on Activities • Evaluated Pilot Project Design Alternatives • Commenced Monitoring Flow and Salinity in Delta • Initiated Fisheries Studies

  5. Pilot Project Objectives • Confirm WQ Benefits • Monitor Impacts of the Project • Fisheries • Recreation • Ecology • Modify Project Operations to Minimize Impacts

  6. Mokelumne R i v e r Three Mile Slough San Joaquin River Potato Slough San Joaquin River Fisherman’s Cut F a l s e R i v e r Old R i v e r FRANKS TRACT Old River Holland Cut Sand Mound Slough

  7. Pilot Project Alternatives Gates in Three Mile Slough Gates in False River Gates in Old River Gates in Sand Mound Sl. Gates in West False River Gates in Holland Cut

  8. Obermeyer Gates

  9. Cross Section GATE PANEL IN RAISED POSITION GATE PANEL IN LOWERED POSITION

  10. Preliminary Design – Gated Alternative CONTROL BUILDING & PARKING AREA FALSE RIVER GATE STRUCTURE

  11. False River Gated AlternativeElevation of Gated Structure – Looking D/S CLOSED GATE PANEL OPEN GATES SHEETPILE CUTOFF WALL CONTROL BUILDING

  12. Tidally Averaged EC, SWP 2002 – Dry Year Base Three Mile Slough Gate False River Gate – Closed False River Gate – 20 % Open Period of Operation

  13. Tidally Averaged EC, CVP Base Three Mile Slough Gate False River Gate – Closed False River Gate – 20 % Open

  14. Tidally Averaged EC, Old River @ CCWD Intake Base Three Mile Slough Gate False River Gate – Closed False River Gate – 20 % Open

  15. Tidally Averaged EC, CCWD Intake @ Rock Sl Base Three Mile Slough Gate False River Gate – Closed False River Gate – 20 % Open

  16. Three Mile Slough – Tidally Averaged EC: June thru Dec, 2002 BASE THREE MILE SL. MODIFICATON

  17. September 2002 (Dry Year) Comparison EC Reduction 14.3% 10.6% 19.1% 21.1% 9.1% 5.4% 16.0% 21.2% 6.8% 2.4% 15.7% 19.7% 22.6% 18.5% 25.0% 25.1%

  18. Construction Cost Summary

  19. Alternative Evaluation • Conceptual Design • Value Engineering Study – Mid 2007

  20. DCC/TDF/FT Salmon Smolts Outmigration Studies • Pilot Study – Dec 2006-Jan 2007 • Regional Fish Study - Fall 2007

  21. PROJECT SCHEDULE 2007 VE Study 2007 2008 EIR/EIS 2008 2009 Final Design/ Permits 2009 2010 2011 Construction 2010 2011 2012 2013 2014 Monitoring

  22. Pilot Project Budget (2006 dollars)

  23. Project Funding Options • Funding Strategy • 1/3rd from State Funds • 1/3rd from Federal Funds • 1/3rd from Water Users (SWP, CVP, CCWD)