1 / 7

PA/QA STATUS

PA/QA STATUS. MPE /PACS/IGL. PACS PA/QA TEAM. PA/QA Documents. Open Critical Items as available yet. IAC : No formal qualification for soldering (CRISA) Critical delivery schedule for PSC ASIC IMEC: Some minor critical items are listed:

tallys
Download Presentation

PA/QA STATUS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PA/QA STATUS MPE /PACS/IGL PA/QA Status

  2. PACS PA/QA TEAM PA/QA Status

  3. PA/QA Documents PA/QA Status

  4. PA/QA Status

  5. Open Critical Items as available yet • IAC : No formal qualification for soldering (CRISA) Critical delivery schedule for PSC ASIC • IMEC: Some minor critical items are listed: concern to process control -procurement, manufacturing, handling • MPE: Unknown effects of cosmic ray hit rates cannot be taken into account while validation process of SPU HLSW. PA/QA Status

  6. QA : further activities • Following issues must be intensified : • Procurement included incoming inspection • Manufacturing control and inspection included documentation, workmanship standards, process and material identification, KIP/MIP, metrology and calibration, cleanliness, storage, packaging and transportation • Non-conformance management • Software QA • Failure prevention management PA/QA Status

  7. PA : further activities Unification of PA/QA systems will be promoted Documents will be harmonized as far as possible Cooperation between PA operators will be encouraged -Training in PA/QA-methods will be initialized if necessary -Rework of FMECA as the basis of bottom-up tools like HSIA, CIL, FDIR PA/QA Status

More Related