220 likes | 346 Views
GEO Task AR-07-02 Architecture Implementation Pilot. George Percivall gpercivall@opengeospatial.org GEO ADC Meeting, 28 February & 1 March 2007. GEO Task AR-07-02 Architecture Implementation Pilot. Task Sheet GEOSS Clearinghouse RFI GEOSS Web Portal Portal RFI Proof of Concept Phase
E N D
GEO Task AR-07-02Architecture Implementation Pilot George Percivall gpercivall@opengeospatial.org GEO ADC Meeting, 28 February & 1 March 2007 Slide # 1
GEO Task AR-07-02Architecture Implementation Pilot • Task Sheet • GEOSS Clearinghouse RFI • GEOSS Web Portal Portal RFI • Proof of Concept Phase • Call For Participation (CFP) • Architecture • Pilot Phase Slide # 2
GEO Task AR-07-02Architecture Implementation Pilot • Lead incorporation of contributed components consistent with the GEOSS Architecture… • …using a GEOSS Web Portal and a GEOSS Clearinghouse search facility • …to access services through GEOSS Interoperability Arrangements • …in support of GEOSS Societal Benefit Areas Title from AR-07-02 task sheet Slide # 3
AR-07-02 and other ADC Tasks • Consolidation of tasks from 2006 into AR-07-02 • GEOSS Clearinghouse AR-06-05 • GEOSS Web Portal DA-06-07 • Coordinate with Task AR-07-01 • Process for Reaching GEOSS Interoperability Arrangements (AR-06-01) • GEOSS Interoperability Strategic Guidance (AR-06-02) • GEOSS Components Registration (AR-06-04) • Other tasks Slide # 4
GEOSS Clearinghouse AR-06-05 • Task accomplishments in 2006: • RFI released; Demo at GEO-III • Request for Information (RFI) • Candidate architecture for distributed catalog network • Call for participants in Proof of Concept phase • Responses to RFI due December 2006 • http://www.earthobservations.org/docs/RFI_GEOSS_Clearinghouse_13.10.2006.pdf • Results of RFI • RFI Response Summary Document; 11 responses • Proof of Concept Testing for Catalogues begun Slide # 5
BNSC/Infoterra Canada/GeoConnections EC/JRC ESA GEONETCast Germany IGOS-Geohazards Japan/JAXA/Univ. of Tokyo UNGIWG/FAO/UNEP US/FGDC/IEEE US/NASA Clearinghouse RFI Responses Slide # 6
GEOSS Web Portal DA-06-07 • GEOSS Web Portal RFI • Issued in Jan ‘06, Responses in Feb ‘07 • Portal RFI Responses • Germany • European Space Agency (ESA)/FAO • Open Geospatial Consortium (OGC) • George Mason University, ESRI, Compusult • United States (NASA) • Identified need for GEOSS user scenarios Slide # 7
Proof of Concept (POC) Activities • POC Phase: 1st Qtr 2007 • Element of GEO Task AR-07-02 • Combines Clearinghouse, Portal and Services work • Catalogue testing • Technology Integration Experiments (TIE) • OGC Catalog Service for the Web (CSW) • Seeking scenarios from GEOSS users • Summary Response document • Update RFI architectures based upon responses • Updated architecture will be part of CFP Slide # 8
GEO Task AR-07-02Architecture Implementation Pilot • Task Sheet • GEOSS Clearinghouse RFI • GEOSS Web Portal Portal RFI • Proof of Concept Phase • Call For Participation (CFP) • Architecture • Pilot Phase Slide # 9
GEOSS Architecture Implementation Pilot • “Pilot” - implementation of interoperability arrangements in a persistent environment • Develop recommendations for GEOSS Web Portal and Clearinghouse • Demonstration in advance of the EO Summit • Portals, Clearinghouse/catalogues and Services • Scenario supporting one or more GEOSS SBAs. • Utilize OGC Procedures for conducting a pilot • Schedule: Initiation in 1st quarter 2007, 6 month development Slide # 10
Task A Concept Development Task B RFQ/CFP* Development Task C Kick-off Preparation Task D Task E Execution Deploy Pilot Approach OGC Pilot Policy and Procedure http://www.opengeospatial.org/ogc/policies/ippp *RFQ/CFP = Request for Quotation/Call for Participation Slide # 11
AR-07-02: Milestones • AR-07-02 Pilot Plan Development Dec‘06 – Jan‘07 • GEOSS SBA inputs/scenarios Jan ‘07 • CFP Preparation Jan – Feb • CFP Releases Feb – March • CFP Responses March • Clearinghouse POC complete March • Pilot Kickoff meeting April • Deploy, Integrate, Test 4 mo. April to August • Demonstration September 2007 • Persistent Capability After September Slide # 12
Roles on Pilot Initiative • Participants • Organizations that contribute components and demonstration support • IP Team • Engineering and management team • Facilitate architecture discussions and demonstration development • Architects and Task Lead • Other roles: sponsors and observers • Organizations may staff more than one role Slide # 13
Pilot of Pilots FEDEO Pilot GEO AR-07-02 Tri-Lateral Pilot GEO Tasks? OGC Architecture and Standards for Earth Observation Slide # 14
CFP Architecture • Developed from RFI and Responses • RM-ODP Viewpoints for architecture • Enterprise: purpose, scope, and scenarios • Information: features, coordinates, semantics • Computational: service oriented architecture • Identifies candidate interoperability arrangements • Engineering: component types • Technology: component instances ISO/IEC 10746: IT-Open Distributed Processing - Reference Model (RM-ODP) Slide # 15
User Interfaces GEOSS Web Portal Other Services Community Portals Community Services Community Catalogs Portal Portal Portal Portal Decision-Support Clients GEO Web Site Portal Portal Portal Portal Portal Portal Catalog Client Business Processes Catalog Server GEOSS Clearinghouse Other GEO Registries Catalog Clients ISO 23950 Registers Registers OGC CSW Data Access Observation Access Services Model Access Services GEONETCast Portal Portal Portal Portal CFP Engineering Architecture Slide # 16
EO-Portal – ESA GeoConnections Discovery Portal EU Geoportal NASA Earth Science Gateway ESA Service Support Environment IGOS-Geohazard Geoportal Bund JAXA Metadata Catalogue JAXA WGISS Test Facility for CEOP USGS/IEEE Registries Infoterra Web Map Service UNSDI/FAO/UNEP components GEONETCast EO GEO Global Spatial Data Infrastructure (GSDI) Registry Global Change Master Directory (GCMD) Consortium for International Earth Science Information Network (CIESIN) ADEN/AADN ALOS Interoperability – ESA WMO Global Telecommunications System (GTS) Future WMO Information System (FWIS) United States – National Spatial Data Infrastructure (NSDI) CFP Technology ArchitectureContributed Components - Draft Slide # 17
GEOSS Portal Requirements - Draft • Graphical design of Human-Computer Interface shall use GEOSS design themes • Shall have a TBD interface to web pages hosted at the GEO Secretariat. • Shall provide a catalog client interface • Hosted on a computer at TBD • Maintenance shall be performed by TBD • Shall respond to TBD hits per/hour with less than TBD% degradation of performance vs. no-load performance. • The clearinghouse shall be available at least 99% of the time, i.e., approximately 7 hours of down time a month. Slide # 18
GEOSS Clearinghouse Requirements - Draft • Shall provide a catalog service interface • TBD hits per day • Shall provide catalog client interfaces • Shall provide a registry for • GEOSS Community Catalog Service metadata • (others) • Registration into Clearinghouse by the TBD methods • TBD interface to registries hosted at the GEO Sec • Hosted on a computer at TBD • Maintenance performed by TBD org. • Availability >99%, i.e., ~ 7 hours of down time a month Slide # 19
Expectations for Sept/Nov • Minimum • Register components and services • Discover datasets and services from more than one GEO Member & PO (Ocean, land, atm, health, economic) • Invoke services, e.g., viewing, access, alerting • Demonstrate using scenarios from SBAs, e.g., predictive capability (targeting hot spots) • Reach • Value-add services • Service chaining Slide # 20
Potential demonstration scenarios • Disaster management / Emergency Response • Climate change • Polar (IPY) Slide # 21
AR-07-02: Output & Deliverables • Persistent capability • GEOSS Webportal • GEOSS Clearinghouse/Catalogues • Services to meet SBA scenarios • GEOSS Architecture Implementation Report Slide # 22