D0 Weekly Summary: Nov. 24 – Dec. 1. Started to take Physics Data! Overall status – OK D0 Silicon detector status: Worked in all runs and no major problems discovered The number of disabled HDIs slowly increased to 114 (12.5%) Before shutdown we had 136 HDIs disabled

tameka
Download Presentation

D0 Weekly Summary: Nov. 24 – Dec. 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. D0 Weekly Summary: Nov. 24 – Dec. 1 • Started to take Physics Data! • Overall status – OK • D0 Silicon detector status: • Worked in all runs and no major problems discovered • The number of disabled HDIs slowly increased to 114 (12.5%) • Before shutdown we had 136 HDIs disabled • Finally we enabled 40 HDIs and disabled 18 “new” HDIs (but most of them came from the list of unstable HDIs) • Almost all enabled HDIs (except of 2-3) participate in track reconstruction! S.Burdin

  2. Silicon related plots Plots from the last week run S.Burdin

  3. Fiber Tracker • Stable running • Known issues: • ~10 SVX chips are not yet fully operational… S.Burdin

  4. Calorimeter • had problem with LV PS early in the week – Currently OK S.Burdin

  5. Muon System • Stably working in Global runs • 3 PDTs out of 94 are not working well • ~1 hour access is needed to replace the Front End electronics (no rush) S.Burdin

  6. Triggers & Collected Data • Trigger rates are OK @ L1,L2,L3 • The FEB is a little higher • ~15% @ 1.5kHz (5-6% before shutdown) • Delivered Integrated Luminosity ~3.27pb-1 • Recorded ~2.38pb-1 (~73%) • 9902k events • Major problems which caused the downtime: • Fri: Solenoid protection electronics failure ~4 hours • Sat: MCH <-> FCH router failure ~2 hours S.Burdin

  7. Summary • First week of physics data taking • Daily data taking efficiency (Saturday) reached ~ 90 % • Access needs: ~1 hour for Muon System (not rush) S.Burdin