1 / 4

CERTIFICATION DAY PROCEDURES

CERTIFICATION DAY PROCEDURES. CERTIFICATION DAY PROCEDURES. Certification Day Process Flow. Exit. Station 5 Scales. Background Table. Station 5 Scales. Station 9 Fix table. O/L. Entrance. Station 2 - Flash Drive. Station 4 - Pictures. Station 1A. Station 3 – Roster print.

tamera
Download Presentation

CERTIFICATION DAY PROCEDURES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CERTIFICATION DAY PROCEDURES

  2. CERTIFICATION DAY PROCEDURES

  3. Certification Day Process Flow Exit Station 5 Scales Background Table Station 5 Scales Station 9 Fix table O/L Entrance Station 2 - Flash Drive Station 4 - Pictures Station 1A Station 3 – Roster print Table Station 7 – Book Check Station 6 Arts&Crafts Station 8 Scholastics

  4. Team Staging Areas/Coach Check-In Ready Area Participants/Badgedpersonnel only! Cecil Field Gym Station 1 A All participants stage in this area until called to Final Staging area • NOTES: • Preliminary, Final and Ready Staging Areas are for participants and badged personnel only! • Coaches are required to maintain team order at all times! • Infractions willresult in process delays for your team! Head Coach Check-In Station 1 Final Team Staging Area Preliminary Team Staging Area

More Related