Session 1: Progress and Status of Implementation and Standardisation Global Standards

Session 1: Progress and Status of Implementation and Standardisation Global Standards. ASAS-TN2 3 rd Workshop Glasgow 11-13 September 2006 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL. European Organisation for the Safety of Air Navigation. Overview.

tamitha
Download Presentation

Session 1: Progress and Status of Implementation and Standardisation Global Standards

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Session 1: Progress and Status of Implementation and StandardisationGlobal Standards ASAS-TN2 3rd Workshop Glasgow 11-13 September 2006 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety of Air Navigation

  2. Overview ADS-B Requirements Focus Group (RFG) RFG Development Status RFG Planning Overall ADS-B Standardisation Lessons Learned

  3. RFG Scope and Approach ASA/GSA Package I Global Harmonisation Requirements Determination Implementation Baseline Pragmatic and Adaptive

  4. RFG Requirements Determination Process SYS OPS Application Definition Safety Performance Interoperability

  5. RFG Products Application Definition OSED Safety Performance SPR + Interoperability INTEROP

  6. High Level Status per ASA (+GSA) Application

  7. Status: ADS-B-NRA “Enhanced ATS in Non-radar Areas” Operational Requirements Safety & Performance Requirements Interoperability Requirements OSED SPR INTEROP • First RFG deliverable • ED-126 v4.0 distributed for EUROCAE/RTCA WC/FRAC • EUROCAE/RTCA WG approval for 28 September 06

  8. Status: ATSA-VSA“Enhanced Visual Separation on Approach” Operational Requirements Performance Requirements Safety Requirements • Pioneering ATSAW OPA work • Initial Operational Safety Assessment document under review: • Further updates to fully reflect ED-126 OSA approach OSED OPA OSA

  9. Status: ATSA-ITP“In-trail Procedure in Oceanic Airspace” Operational Requirements OSED Performance Requirements Safety Requirements • OHA and validation feedback led to OSED refinement: • Final comment resolution is on-going • OSA (& OPA) work well advancing • At collision risk modeling & hazard/fault tree level OPA OSA

  10. Status: ATSA-SURF“Enhanced TSA on the Airport Surface” Operational Requirements Performance Requirements Safety Requirements • Final OSED update process underway • Detailed OPA and OSA activities to be kicked-off OSED OPA OSA

  11. Status: ATSA-AIRB“Enhanced TSA During Flight Operations” Operational Requirements Performance Requirements Safety Requirements • Former 3 sub-applications merged them into single OSED • Introduction of different scenarios • “Proper” basis for OSA and OPA activities • Pending start of detailed OPA and OSA activities • ‘Intentional misuse’ of CDTI to be covered in OSA OSED OPA OSA

  12. Status: ASPA-S&M “Enhanced Sequencing & Merging Operations” Operational Requirements Performance Requirements Safety Requirements • Progressing alignment with UPS Merging & Spacing activities: • Adding two OSED appendices: M&S description + Impact of CDA • Impact on SPR/INTEROP work to be further established OSED OPA OSA

  13. High-level RFG Planning Sep 06 Dec 06 Mar 07 Jun 07 Sept 07 Dec 07 Mar 08 Jun 08 Sept 08 ADS-B-NRA ADS-B-RADATSA-ITP ADS-B-APTATSA-VSA ATSA-AIRBATSA-SURF Schedule TBD: • ASPA-S&M – Awaiting maturity of UPS/ACSS M&S concept. • ADS-B-ADD – No mature OSED/lack of stakeholder interest to date

  14. Overall ADS-B Standardisation PANS- ATM PANS- OPS ICAO (OPLINK, ASP, SASP, NAT IMG) Annex 10 Requirements Focus Group (EUROCAE WG51, RTCA SC-186, EUROCONTROL, FAA) SPR INTEROP EUROCAE WG51 RTCA SC-186 MASPS MOPS Group Standard

  15. Lessons Learned (so far …) Team Establishment Working Arrangements Methodology System vs. Sub-System Top-down vs. Bottom-up Critical Resources

  16. Summary RFG progresses on all its fronts … and delivers: ED-126 Ambitious work programme Resources are critical Foundation for future ASAS implementations