An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jerry FitzPatrick, David Holmberg, Tom Nelson, Eric Simmon, Ken Wacks, Dave Hardin, and other DEWG Chairs Monday May 24, 2010

  2. 3:30 SG Domain Expert Working Groups Joint Session Charter Overview • Introduction of work items for each DEWG: H2G, B2G, I2G, T&D, B&P, V2G • 3:40 Do we have the right DEWGs? • a discussion on how best to sub-divide the work to accomplish the mission • Are we missing any stakeholders, or missing needed collaboration? • What are the overlaps – where should DEWGs be coordinated? • 3:55 Discussion of conclusions • 4:05 A look at the PAPs and where they fit on the Conceptual Architecture • Have we covered the bases? • What PAPs should the DEWGs be monitoring • What what new PAP areas should the DEWGs be exploring? • 4:20 Discussion of conclusions • 4:30 Adjourn

  3. DEWGs in context of SGIP

  4. Officers: Chair • At the decision of the DEWG, a Vice Chair and Secretary may also be elected. • DEWG officers will be confirmed by NIST. DEWG Roles and Responsibilities: Perform analysis of standards interoperability • Identify gaps and overlaps • Evaluate PAP proposals and collaborate on PAPs where appropriate • Analyze smart grid interoperability requirements • Review other SGIP group work products to provide domain perspective • Respond to SGIP requests for domain analysis Provide the strategic DEWG domain perspective • identify strategic issues that need to be addressed • Provide input on ongoing development and direction of NIST Framework • Identify regulatory and policy issues

  5. Work Process/Outputs: • Sub-groups may be created to address tasks • Outputs may be white papers, use cases, or any other format as deemed by the DEWG; posted on the DEWG collaboration site and IKB; presentations by experts in workshops & tutorials Deliverables: Individual or collective reviews of a proposed PAP plan. • At request of the GB, give an update on priority standards • Review, extend, modify use cases developed by other SGIP groups • At request of the PMO, review work from a committee • Focus on strategic issues relevant for smart grids and consult with the GWAC • Develop guidelines for sets of standards that together provide for communications interoperability to address a specific domain application.

  6. Building interface to the grid • Architecture, information requirements, standards interoperability issues at the B2G interface • Interests and concerns of the commercial building domain stakeholders

  7. Initial analysis of interoperability needs at the grid to facility interface, and prioritization which served as input to original PAPs. • Defining the architecture of the interface connections from grid to facility domain • Analysis of standard technical approach for energy management solution for small commercial market in Japan. • Discussions on interesting topics like transactive energy and Dutch applications of that.

  8. Review and discussion of the EIS Alliance use cases and requirements as input to PAP10 • DEWG charter development • Analysis of standards landscape and direction of PAPs 3, 4, 9 • Review of the CSWG NISTIR 7629 • This week looking at requirements of the commercial building domain (vs. residential) to put together a “Commercial Buildings Primer”

  9. Minutes and some topic pages on the Twiki • Most outputs are indirect—via review and comment on documents. • B2G Interoperability Assessment and Roadmapping document. • Papers at Grid Interop based in part on group discussions.

  10. Industrial interfaces to the grid • Architecture, information requirements, standards interoperability issues at the I2G interfaces • Represent the interests and concerns of industrial stakeholders

  11. 25% of the Grid consumption • Industrial Facilities – Large and Small • Manufacturing Plants • Continuous - Refining • Batch - Chemical • Discrete – Assembly • Central Power Plants

  12. Have captive on-site generation including backup generation Are large consumers of power Are highly integrated and automated Have on-site technical and supports staffs Are often located far from population centers Own significant real-estate

  13. Capital intensive • higher level of utilization to get a sustainable return on investment • Somewhat inflexible with respect to time • customer commitments and interdependency in process steps • Products may be perishable • Energy is a significant component of the cost of production. • Consumers and Producers

  14. Developing an “Industrial Interface Recommendations” White Paper • Why Industrial Interfaces are Different from Home Interfaces • Clarify the domain needs and requirements of industrial users

  15. Scope: Utility transmission and distribution operations as well as interactions with other producer/users on the grid. • Goals: • To create unprecedented robustness and resilience to grid instabilities and disturbances for improved reliability. • To improve power quality to meet customer needs and enable ready access for distributed generators to the grid • Biweekly teleconferences: Wednesdays at 4:00 PM Eastern • http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/SGIPCalendar • NIST SG Twiki: http://collaborate.nist.gov/twiki- sggrid/bin/view/SmartGrid/TnD

  16. White Papers: • Wide Area Monitoring, Automation, Communications and Control (WAMACC) for the Bulk Transmission System • Smart Grid for Distribution Systems: The Benefits and Challenges of Distribution Automation (DA) • Smart Grid Focused Use Cases for Distribution Grid Management Presentations: • EPRI Use Case Export/Import Tools and UML Models • Goal-Driven Use Cases

  17. Do we have the right DEWGs? - a discussion on how best to sub-divide the work to accomplish the mission • Are we missing any stakeholders, or missing needed collaboration? • What are the overlaps?

  18. Smart Grid Action Plans

  19. 3 3 3 5 2 2 5 2 3 1 1 5 1 3 3 4 • Use of IP • Wireless Guidelines • Pricing Model • Scheduling • Meter Profiles & Upgrade Std Smart Grid Action Plans

  20. 7 9 7 9 8 9 7 8 7 • ANSI C12 to Common Info Model (CIM) • Storage Interconnect • CIM Distribution Models and Harmonization • Standard DR Signals • Energy Usage to Customer 10 6 10 Smart Grid Action Plans

  21. 14 11 11 14 11 11 12 12 14 11 13 • Models for Electric Transportation • IEC 61850 to DNP3 • Time Synch • Integrate Transmission & Distribution Models and Relay Settings Smart Grid Action Plans

  22. PAPs and the Conceptual Architecture • Have we covered the bases? • What PAPs should the DEWGs be monitoring • What new PAP areas should the DEWGs be exploring?