WP33 Transport/Installation Supports and Suspensions

WP33 Transport/Installation Supports and Suspensions. Overview Support and Suspensions What we have! Installation Vehicle ( TEC Talk). XTL. 2.15m. XTL. 1m. ~1m. 2.15m. From XTL to XS1. 1m. 2.15m. From XS1 into XTL. ¿ Dump Line 1m below Beam Line ?

tania
Download Presentation

WP33 Transport/Installation Supports and Suspensions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP33 Transport/Installation Supports and Suspensions Overview Support and Suspensions What we have! Installation Vehicle (TEC Talk) Norbert Meyners, WP33/MEA1

  2. XTL Norbert Meyners, WP33/MEA1 2.15m

  3. XTL Norbert Meyners, WP33/MEA1 1m ~1m 2.15m

  4. From XTL to XS1 Norbert Meyners, WP33/MEA1 1m 2.15m

  5. From XS1 into XTL ¿ Dump Line 1m below Beam Line ?  Sufficient Space for Emergency Way? Smoke Extraction (█-Shape) Survey Pipe He-Pipe Norbert Meyners, WP33/MEA1 2.5m ?

  6. XTL/XS1 - Sufficient Space for Small Emergency Way South of Dump Beam Line? Norbert Meyners, WP33/MEA1

  7. Supports and SuspensionsWhat we have already (Old Picture!) Norbert Meyners, WP33/MEA1

  8. Ceiling Interface Norbert Meyners, WP33/MEA1

  9. Module Suspension Norbert Meyners, WP33/MEA1

  10. 1. Baseline Layout BC Sections: XTL Cross section • Ersatzfluchtweg verschwenkt (über den gesamten BC) • Betonabschirmung und Racks unter die Beamline Redirected escape route 2.0 m x 0.8 m 1.0 1.3 • Wasser/Strom-Versorgung Norbert Meyners, WP33/MEA1

  11. 1. Baseline Layout BC Sections: Side view Cryo Bypass 1.7 5.2 2.15 1.4 1.1 Konstruktionszeichnung Girder: G. Weichert 2.0 Norbert Meyners, WP33/MEA1