1 / 20

Waste management in the Helsingborg region

Waste management in the Helsingborg region. NSR AB. NSR – a regional business partner. Founded in 1982.Owned by six municipalities, services to 225 000 inhabitants in the region, and industry NSR receives one heavy lorry every minute during opening our.

Download Presentation

Waste management in the Helsingborg region

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Waste management in the Helsingborg region NSR AB

  2. NSR – a regional business partner Founded in 1982.Owned by six municipalities, services to 225 000 inhabitants in the region, and industry NSR receives one heavy lorry every minute during opening our.

  3. Responsibility – Helsingborg municipality The municipality is responsible for • Waste planning • Fees The public owned company NSR AB carry out the waste management services for the Helsingborg municipality, and five more municipalities

  4. Waste management services at NSR AB • Collection at households • Treatment • Waste planning • Fees • Invoicing • Procurement • Follow-up contracts • Information - Customer service • Counselling • Waste management planning and regulations • Sustainable urban planning – development projects

  5. NSR facts • Owned by six municipalities • 225 000 citizens • 140 employees • Turnover – 40 MEURO/year

  6. NSR Management Båstad Höganäs Bjuv Helsingborg Åstorp Ängelholm Steering committee Managing Director Marketing Economy & administration Environmental control Production

  7. Collection of household wasteSource separation – nine fractions Nine separate fractions in two bins for each single family household: Metal packaging, Paper packaging, Soft and Hard plastic packaging, Coloured and Clear glass bottles, Newspapers, Food waste, Mixed waste

  8. Waste collection system

  9. Producers responsibility(packaging and paper) Some of the packing and papers are collected at the house holds

  10. Six Recycling Centers in the North West of Skåne Visitors: 200–500 private vehicles per day and center

  11. Fees • All costs covered by waste fees for household waste • Self-cost principle • Instrument for waste sorting • Two categories: • houses • apartments/enterprises

  12. Fees (cont.) • Fees are divided into a fixed and a variable fee • Fixed fees • waste planning • Recycling centres • Information • Service for costumers • Collection of bulky waste four times per year • Variable fees • Collection • Treatment • Rental of bins

  13. Treatment • Recycling • Biogas production • Production of RDF (Refuse derived fuel) • Hazardous waste management • Contaminated soil treatment • Waste incineration plant (Managed by public owned regional energy company) Founded in 1982.Owned by six municipalities, services to 225 000 inhabitants in the region, and industry NSR receives one heavy lorry every minute during opening our.

  14. Recycling facilities • Glas • Paper • Card board • Metal • etc

  15. Biogas from anaerobic digesters 4,0 million m3 of vehicle fuel

  16. Biogas and bio fertilizer NSR’s Biogas Plant

  17. Bio fertilizer Biogas

  18. Landfill gas to green electricity and central heating Construction start: 1985 Number of gas wells: over 100 Gas content: 50 – 60% methane Capacity: 6 million Nm3 per year The gas is extracted through a network of pipes, gas drains and gas wells in the landfill. The landfill gas supply the equivalent of 3.450 private houses in Helsingborg a year.

  19. Waste incineration plant - Under construction Öresundskraft – Regional energy company Project start: June 2010 Process start: Jan 2013 Investment. 180 MEURO 160 000 ton of waste 125 GWh electricity per year 450 GWh heating per year

  20. Thank you for listening! Thank you! Håkan Rosqvist hakan@rosqvist-resurs.se

More Related