Reliability Standards Activities September 2007 Farzaneh Tafreshi Texas Regional Entity

Texas Regional Entity activities for September 2007 include forming committees, system training, reliability standards, and regulatory filings. Stay updated with ERCOT.

tarmando
Download Presentation

Reliability Standards Activities September 2007 Farzaneh Tafreshi Texas Regional Entity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reliability Standards Activities September 2007 Farzaneh Tafreshi Texas Regional Entity 7620 Metro Center Drive Austin, Texas 78744 (512) 225-7251 Email: ftafreshi@ercot.com

  2. Texas Regional Entity Activities • Texas RE Board of Directors approved the three TRE procedure documents on August 21, 2007. • Registered Ballot Body • Reliability Standards Committee • Standards Drafting Team • Texas RE begins forming the Reliability Standards Committee and the Registered Ballot Body.

  3. Standards Posted for Comment • System Personnel Training (Project 2006-01) (08/15/07 - 09/28/07) • PER-005 — System Personnel Training

  4. Standards Posted for Comment • System Restoration and Blackstart (Project 2006-03) (08/15/07 - 09/28/07 ) • EOP-005 — System Restoration Plans • EOP-006 — Reliability Coordination - System Restoration • EOP-007 — Establish, Maintain, and Document a Regional Blackstart Capability Plan • EOP-009 — Documentation of Blackstart Generating Unit Test Results

  5. Standards Posted for Comment • Real-time Operations (Project 2007-03) (08/09/07 - 09/07/07) • COM-001-1 Telecommunications • COM-002-2 Communications and Coordination • IRO-004-1 Reliability Coordination – Operations Planning • IRO-005-2 Reliability Coordination – Current Day Operations • IRO-006-3 Reliability Coordination – Transmission Loading Relief • TOP-001-1 Reliability Responsibilities and Authorities • TOP-002-2 Normal Operations Planning • TOP-003-0 Planned Outage Coordination • TOP-004-1 Transmission Operations • TOP-005-1 Operational Reliability Information • TOP-006-1 Monitoring System Conditions • TOP-007-0 Reporting Sol and IROL Violations • TOP-008-0 Response to Transmission Violations • PER-001-0 Operating Personnel Responsibility and Authority

  6. Current Ballot • ERCOT Request for Interpretation - BAL-003-0, R2, 2.2, 5, and 5.1 (08/27/07 - 09/05/07) The Electric Reliability Council of Texas (ERCOT) submitted a Request for an Interpretation of BAL-003-0 — Frequency Response and Bias Requirements 2, 2.2, 5, and 5.1. The request asked if there was a conflict between Requirement 2, which allows use of a variable bias setting and Requirement 5, which does not specifically address the use of a variable bias setting. The Interpretation clarifies that in reliability standard BAL-003-0, Requirements 2 and 5 do not conflict with one another. The initial ballot for this interpretation is open and will close at 8 p.m. (EDT) on Wednesday, September 5, 2007.

  7. Pending Regulatory Filing • Interpretation of BAL-001-0 Requirement 1 and BAL-003-0 Requirement 3 The Western Electricity Coordinating Council (WECC) requests an interpretation applicable to the NERC standard requirements BAL-001-0, R1 and BAL-003-0, R3. Specifically, the WECC asks that NERC conclude and confirm that the WECC's Automatic Time Error Control Procedure (ATEC) does not violate NERC standards. This interpretation would permit the continued use of WECC's ATEC within the Western Interconnection.   The interpretation of BAL-001 R1 and BAL-003 R3 was approved by stakeholders and is pending regulatory filing.

  8. Pending Regulatory Filing • Interpretation Request (VAR-002-1 - Generator Operation for Maintaining Network Voltage Schedules) Mariner Consulting Services, Inc., requested a formal interpretation to VAR-002-1 — Generator Operation for Maintaining Network Voltage Schedules, Requirements 1 and 2. Members of the Phase III–IV Standards Drafting Team, working with NERC staff, developed the interpretation. The interpretation for standard VAR-002-1, Requirements 1 and 2 was approved by stakeholders and is pending regulatory filing.

  9. Reliability Standards Filed and Pending Regulatory Approval • Petition to Approve Version 0 Violation Risk Factors Filed with FERC - February 23, 2007 • Petition to Approve Reliability Standards Filed with FERC - August 28, 2006 • Petition to Approve Reliability Standards Filed with FERC - November 15, 2006 • Informational Filing on Reliability Standards Development Plan: 2007-2009 - December 1, 2006 ** For more detail on the specific filings, refer to the provided hyperlinks**