Dry Run- Week 13 - Infrastructure

Dry Run- Week 13 - Infrastructure. LHC OP + BI logging running Energy distributed by energy simulator: 10 seconds 450 GeV, 15 minutes ramp to 7 TeV, 10 seconds 7 TeV, 15 minutes ramp to 450 GeV Energy logged under LHC->Beam Interlocks->SMP in units of 120 MeV Timing up and running

tassos
Download Presentation

Dry Run- Week 13 - Infrastructure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dry Run- Week 13 - Infrastructure • LHC OP + BI logging running • Energy distributed by energy simulator: 10 seconds 450 GeV, 15 minutes ramp to 7 TeV, 10 seconds 7 TeV, 15 minutes ramp to 450 GeV • Energy logged under LHC->Beam Interlocks->SMP in units of 120 MeV • Timing up and running • Injection table played by sequencer • Sequence: Play Inj Tbl Async • Needed by BTVs and FIFO concentrator • All concentrators running: BLM running sums, BLM capture, BPM FIFO, BPM capture • Operational HyperCycle: INJ-TEST

  2. Dry Run - Week 13 – BI - Results • All in all: already quite successful. • Summary under: • https://espace.cern.ch/mddb/Lists/ActivityTracking/ActivityTracking%20simplified.aspx • Looked at: • BPMs → Concentrators , OFSU→ YASP, MultiTurn • FBCTs, DCBCTs → Applications, fixed displays, logging • BLMs → Concentrators → BLM monitoring applications (running sums, capture), threshold editor • → MCS online checks: all BLMs critical • Abort gap monitor → Application, logging • LHC timing BTVs → Application, logging • Tune → Application, logging • No post mortem events, no beam dumped events

  3. Dry Run - Week 13 – Issues (1) • RBAC policy strict mode: we are not ready yet • Changed back to lenient shortly after • Need a dedicated dry run after switch to strict mode later on • (Problems with old CMW name server) • BTV proxies: no solution yet • Need to come back to BCTs • Logging • not everything logged that is defined: Profiles for wire scanners, certain parameters of BCTs (see summary), some BLMs (disconnected? ( see summary)), BBQ • partly nothing defined: abort gap monitor, orbit • SDDS directories....OK now [but not final solution yet] • FILL DATA: could we not have some more structure there? • Sub-directories automatically generated: BLM, BPM, YASP, ....

  4. Dry Run - Week 13 – Issues (2) • Request from BLMs: concentrators, sequencer, ....should not use OPERA account anymore. • What shall we use? Special controls account? Different accounts for sequencer, concentrator,...? • Token time-outs!! • Simulated SMP intensity: could not change it → wire scanners protected above certain intensities. • Still issue: problem of new LabView version. • Fixed displays: need to rationalise the number of windows we have. • Example: 4 windows for the FBCTs • Orbit correctors: k → KICK

  5. MCS Tests (1) • Summary under: • http://vkain.web.cern.ch/vkain/MCSTests.htm • Successfully tested except online checks: • LHC BLMs • Dry run: all BLMs were critical. Online check: > 25 minutes (corrected after release, not tested yet) • CISx: safe machine parameters (probe beam intensity, energy limit for stable beam flag) • Online checks not tested yet: waiting for release • Injection kickers: ExpertSettings (operational limits) • SoftStartSetting critical but not tested yet. • Online checks not tested yet: waiting for release • MKD and MKB settings • The new MKB devices are still missing in FESA • Online checks not tested yet: waiting for release

  6. MCS Tests (2) • Still to be done: • LBDS IPOC (issue with global devices) • LBDS BETS (hardware/software not ready) • Interlocked BPMs in point 6 (still no decision on role) • Interlock settings for power converters in transfer lines • Collimators: started tests • Virtual critical settings • Will carry on testing

  7. Next dry runs • Ongoing: FGC tests with operational settings • https://espace.cern.ch/mddb/Activity%20Tracking%20Tool/Activity%20Tracking%20Welcome.aspx?View={593B6E53-F6F9-4485-8646-E7E683D0F681}&SelectedID=28 • Coming dry runs: next slides • Have to test BCTs again. • Propose week 17 : with generation of SMP intensities. • When shall we test with RBAC in strict mode? • June?

  8. Dry Run I – injection equipment • week 14 (2nd and 3rd of April) and week 15 (for BI rather) • MKI 8: run it from control room • New softstart • OASIS: BCT + MKIs; logging • Beam permit loops: need to jumper out also injection BICs • Energy OK from energy from simulation • Application??: need to make sure that can run it through LSA • Application will be ready in week 16 only → SM18 shifts • http://wikis/display/LHCOP/Sequence+-+Soft-start • Timing: ready for week 14 Test mode stuff (need to verify!!) → got email from Jean-Claude: first version will be ready: need to have a little application as well. Just ONE button (only as lhcop). • RF needs to generate the pre-pulse: Andy told me should be OK • Fixed displays • TI 8 and TI 2 • Prepare DC functions (can’t run it...interlocked) • All BI, usual stuff ← maybe not TI 8 BPMs • Logging for new BPMs...new logging for the PC • Injection BI: again concentrators (BLM [also capture] and BPM), injection region BTVs, run injection tables • BTV proxies: for all SPS BTVs

  9. Dry Run II • Week 17 (23rd and 24th of April) - Injection • Beam 1 and beam 2 injections if possible with the BIS • Transfer lines: critical settings for FEI • MKI 2 like before: with application • Week 17 – LBDS software • LBDS monitoring application (no functional test yet, only communication): needs RBAC for the acknowledge • Arming of IPOC and BETS testable (BetsSim) → test new sequences as far as possible • Also, the new CIBG generators and communication with it...for the time being LBDS jumpered out • XPOC (play-back mode), logging • Dump line BI with XPOC events (should trigger XPOC): fixed displays • FBCTs, BLMs, BTVs, BPMs (interlocked BPM), Abort gap monitor • Week 17 – timing: new telegram