680 likes | 819 Views
Dam Safety Case History. Columbia Lock and Dam March 8, 1997. “A number of courageous people worked in sometimes dangerous circumstance to perform their missions. We are grateful that throughout all of this no one was injured and we were all successful in our efforts.”
E N D
Dam Safety Case History Columbia Lock and Dam March 8, 1997 “A number of courageous people worked in sometimes dangerous circumstance to perform their missions. We are grateful that throughout all of this no one was injured and we were all successful in our efforts.” CCHamby 97
Location Map 2 • Felsenthal L&D • Thatcher L&D • Columbia L&D • Jonesville L&D
Columbia L & D Descript 84’ x 600’ Lock 200’ Wide Navigation Pass Miter Gate Flow 4@50’ Wide Tainter Gates West Abutment Guide Wall
8 March 97 Columbia Lock and Dam 9pm
9 March 97 Columbia Lock and Dam 1am
Columbia Lock and Dam 2:45am
10 Mar 97 Photo Barge in Gate 1 • photo
10 Mar 97 Photo Barge in Gate 1
11 Mar 97 Barge Removed from Gate 1 • photo
Identifying the Problems • Remove Two Sunken Barges • Damaged & Inoperable Tainter Gate • Too Much Flow thru the Nav Pass • The River Forecast is Bad News • There is no heavy equipment upstream
Lock Underwater • ___ photo fig II-1 (where is the lock?)
Highway Barriers Lock Underwater • ___ photo fig II-2 Lock Chamber Miter Gate
Highway Barriers • Borrow from LADOTD
Highway Barriers • ___ photo fig II-3
Highway Barriers • ___ photo fig II-4
Miter Gate Extension • Designed and Built Wooden Extension • __photo fig II-5
Miter Gate Extension Fig II-6 9 Apr Timber over miter gate and barriers along the wall
Operating the Lock • __photo fig II-7 opening the gate valves
Passing the Salvage Derrick Barge • __photo fig II-8 derrick barge goes through the lock
Salvage Ops • Orientation of barges fig IV-2
Salvage Ops • ___ fig IV-1
Salvage Ops – Ent Pipe Sktch • Sketch diver going through the pipe to cut holes
Salvage Ops – Ent Pipe Phot0 • ___ figs IV-3 pipe in water
Salvage Ops - Diver • Photo diver going through the pipe to cut holes
Salvage Ops - Tender • Photo diver going through the pipe to cut holes
Salvage Ops - Spectators • TV Media • Spectators photo
Salvage Ops – Barge Exposed • ___ figs IV-4
Salvage Ops – Barge Rising • ___ figs IV-4
Salvage Ops – Barge Raised • ___ figs IV-4
Salvage Ops- Chain Connection • ___ figs IV-x
Stone Repairs Sketch 1 • Show plan view sketch of all holes
Navigation Pass Flow • __photo fig II-10 water thru nav pass 9Apr • add sound from VHF tape
Navigation Pass Damage • __photo fig II-10 9 Apr • Additional Surveys made after river slowed down • Slab fell into the hole (show 3D survey or fig III-10) • Show cross section with hole and stability prob