1 / 11

Today: 12:30 p.m. Avaya Auditorium, ACES Building 2.302

Today: 12:30 p.m. Avaya Auditorium, ACES Building 2.302. Energy Plus & Open Studio Class. Tuesday (November 20), 5:45 PM Computer lab ECJ 3.402 Instructor: Wesley Cole . Lecture Objectives:. Review the midterm exam Project related topics: Discuss the HVAC system configuration in eQUEST

tavi
Download Presentation

Today: 12:30 p.m. Avaya Auditorium, ACES Building 2.302

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Today: 12:30 p.m.Avaya Auditorium, ACES Building 2.302

  2. Energy Plus & Open Studio Class • Tuesday (November 20), 5:45 PM • Computer lab ECJ 3.402 • Instructor: Wesley Cole

  3. Lecture Objectives: • Review the midterm exam • Project related topics: • Discuss the HVAC system configuration in eQUEST • Discuss the life cycle cost analysis • Learn about empirical modeling

  4. HVAC systems in eQUEST

  5. What are the reasons for energy simulations? • System Development (research) • Building design (evaluate different design solutions) • Economic benefits • Budget planning

  6. Life Cycle Cost Analysis • Engineering economics

  7. Parameters in life cycle cost analysis Beside energy benefits expressed in $, you should consider: • First cost • Maintenance • Operation life • Change of the energy cost • Interest (inflation) • Taxes, Discounts, Rebates, other Government measures

  8. Example • Using eQUEST analyze the benefits (energy saving and pay back period) of installing - low-e double glazed window - variable frequency drive in the school building in NYC

  9. What are the reasons for energy simulations? • System Development (research) • Building design (evaluate different design solutions) • Economic benefits • Budget planning

  10. For budget planning Empirical model Load vs. dry bulb temperature Measured for a building in Syracuse, NY Model For average year use TMY2 =835890ton hour = 10.031 106 Btu

More Related