1 / 8

Accelerators R&D at IFIC

Accelerators R&D at IFIC. Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V. Civera, C. Blanch. Main ongoing projects. ATF-ATF2 : Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

tavita
Download Presentation

Accelerators R&D at IFIC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Accelerators R&D at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V. Civera, C. Blanch Enlight Meeting 09

  2. Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) 19 June Enlight Meeting 09

  3. Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) Extraction line drives the beam from ATF to ATF2 19 June Enlight Meeting 09

  4. Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) Since several years, the vertical emittance measured in the diagnostic section of the EXT line is significantly larger than the emittance measured in the DR. Hypothesis: Non-linear magnetic fields while passing off-axis through the shared magnets 19 June Enlight Meeting 09

  5. Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) 19 June Enlight Meeting 09

  6. Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) BPM supports for micromovers: Realignment of BPM to increase the resolution FONT – Feedback On Nanosecond Timescales 19 June Enlight Meeting 09

  7. Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) BPS Prototype Inductive Pick-up (IPU) 19 June Enlight Meeting 09

  8. Main future projects • ILC: BDS instrumentation studies • LHC:non-linear collimation options for sLHC (SPS experiments) (EUCARD) • IFIMED:Imaging and Accelerators applied to Medicicine • Monitoring of secondary beams (beam position and size) (CERN; LLR, CNAO) • Cyclinacs applications (TERA, CTF3) • Beam screen monitor • CABOTO: Carbon Boster for Therapy in Oncology

More Related