80 likes | 189 Views
Accelerators R&D at IFIC. Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V. Civera, C. Blanch. Main ongoing projects. ATF-ATF2 : Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)
E N D
Accelerators R&D at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V. Civera, C. Blanch Enlight Meeting 09
Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) 19 June Enlight Meeting 09
Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) Extraction line drives the beam from ATF to ATF2 19 June Enlight Meeting 09
Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) Since several years, the vertical emittance measured in the diagnostic section of the EXT line is significantly larger than the emittance measured in the DR. Hypothesis: Non-linear magnetic fields while passing off-axis through the shared magnets 19 June Enlight Meeting 09
Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) 19 June Enlight Meeting 09
Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) BPM supports for micromovers: Realignment of BPM to increase the resolution FONT – Feedback On Nanosecond Timescales 19 June Enlight Meeting 09
Main ongoing projects • ATF-ATF2: Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) Instrumentation: New Multi-OTR system (SLAC, KEK) BPM supports with micromovers for FONT4 (KEK, JAI) CLIC-CTF3:BPM’s for TBL (UPC, CERN) BPS Prototype Inductive Pick-up (IPU) 19 June Enlight Meeting 09
Main future projects • ILC: BDS instrumentation studies • LHC:non-linear collimation options for sLHC (SPS experiments) (EUCARD) • IFIMED:Imaging and Accelerators applied to Medicicine • Monitoring of secondary beams (beam position and size) (CERN; LLR, CNAO) • Cyclinacs applications (TERA, CTF3) • Beam screen monitor • CABOTO: Carbon Boster for Therapy in Oncology