1 / 54

Introduction Awareness/Approach of project issues Proposed staffing Other considerations Questions & Answers

Agenda. Introduction Awareness/Approach of project issues Proposed staffing Other considerations Questions & Answers. Agenda. Introduction. Providing CEI service for 25 years Primary service is CEI – “It’s What We Do” Serve as extension of District 1 – eyes & ears

tawana
Download Presentation

Introduction Awareness/Approach of project issues Proposed staffing Other considerations Questions & Answers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda Introduction Awareness/Approach of project issues Proposed staffing Other considerations Questions & Answers Agenda

  2. Introduction Providing CEI service for 25 years Primary service is CEI – “It’s What We Do” Serve as extension of District 1 – eyes & ears “Pro-Active” approach – manage change Serve as a catalyst to the construction process Exercise independent professional judgment Partnering – formal or informal Always learning & listen Awareness/Approach to Project

  3. Awareness/Approach to Project • Introduction • Awareness/Approach to project • Understanding of scope • Identification of unique project issues • Innovative concepts • Proposed staffing • Other considerations • Questions & Answers Awareness/Approach to Project

  4. Awareness/Approach to Project • Understanding of Scope of Project • Key elements of the project • Interchange • Safety enhancement • High Speed • 35% Truck Traffic • Signalized elevated T-intersection. • Bridge • Retaining walls Awareness/Approach to Project

  5. Awareness/Approach to Project • Understanding of Scope of Project • Key elements of the project (cont.) • Drainage • Earthwork • Asphalt • Signalization and lighting • Hybrid project - SR 776 at San Casa Drive Awareness/Approach to Project

  6. Awareness/Approach to Project • Understanding of Scope of Project • Key elements of the project (cont.) • Interchange Awareness/Approach to Project

  7. Awareness/Approach to Project • Understanding of Scope of Project • Key elements of the project (cont.) • Bridge over US 27 • 196 feet long Awareness/Approach to Project

  8. Awareness/Approach to Project • Understanding of Scope of Project • Key elements of the project • Retaining walls • 1.8 miles of wall • Settlement • Phasing Awareness/Approach to Project

  9. Awareness/Approach to Project • Understanding of Scope of Project • Key elements of the project • Drainage • 5,448 feet of storm drainage • 5 Ponds • Bypass ditches • Box culvert extension • Outfalls Awareness/Approach to Project

  10. Awareness/Approach to Project • Understanding of Scope of Project • Key elements of the project • Earthwork • 210,352 CY regular excavation • 362,919 CY embankment Awareness/Approach to Project

  11. Awareness/Approach to Project • Understanding of Scope of Project • Key elements of the project • Asphalt • Temporary pavement • Milling / resurfacing • Superpave traffic level D • Friction course Awareness/Approach to Project

  12. Awareness/Approach to Project • Understanding of Scope of Project • Key elements of the project • Signalization and lighting • New signal – elevated T-intersection • 109 40’ light poles • Temporary lighting • Hybrid project – SR 776 at San Casa Drive • Intersection improvement project • New signalization • Widening with associated asphalt, concrete, drainage Awareness/Approach to Project

  13. Awareness/Approach to Project • Understanding of Scope of Project • CEI Scope of work • Preconstruction • Constructability review • Bid-ability review • Bid tabulations • Preconstruction conference • Schedule pre-services meeting • Schedule Final Estimates meeting • Schedule District Compliance meeting • Schedule meeting with materials office • Schedule Environmental meeting Awareness/Approach to Project

  14. Awareness/Approach to Project • Understanding of Scope of Project • CEI scope of work • Preconstruction (cont.) • Prepare and submit computer access requests • Attend Site Manager/ EDMS information meeting • Partnering meeting / DRB • Videotape pre-construction conditions • Pre-construction survey • Office set-up • Review contractor’s CPM schedule • Review contractor’s QC plan • Set up field books, office files, and documentation Awareness/Approach to Project

  15. Awareness/Approach to Project • Understanding of Scope of Project • CEI scope of work • During construction • MOT review • Inspection of contractor’s work • Materials sampling • Density testing • Environmental monitoring • Measurement of pay item quantities • Contract administration Awareness/Approach to Project

  16. Awareness/Approach to Project • Understanding of Scope of Project • CEI scope of work • During construction (cont.) • CPM reviews • Contractor quality control (CQC) • Project photographs • Project video • Pipe video • Emphasis on INSPECTION! Awareness/Approach to Project

  17. Awareness/Approach to Project • Understanding of Scope of Project • CEI scope of work • Post construction • Final estimate • Permit closeout • As-builts • Issues and Claims Awareness/Approach to Project

  18. Awareness/Approach to Project • Identification of Unique Issues • Utility coordination • Right of way • Maintenance of traffic • Environmental concerns • Contamination • Endangered or threatened species • Hybrid project – SR 776 at San Casa Drive Awareness/Approach to Project

  19. Awareness/Approach to Project • Identification of Unique Issues • Utility coordination (Deborah Barnhill – FDOT) • Century Link • NOT Bill Fetterhoff • Norm Burvurt • Glades Electric Cooperative • Bruce Taylor • Level 3 Communications • Clint Hinish • South Shore Water Association • Chris Carrol • Tommy Perry – Johnson Pruitt Awareness/Approach to Project

  20. Awareness/Approach to Project • Identification of Unique Issues • Right of Way (Tom Small – FDOT) • Greg Bohde (FDOT) • Right-of-Way has NOT yet been acquired, however all agreements are in place and all Orders of Taking should be cleared prior to project start. Awareness/Approach to Project

  21. Awareness/Approach to Project • Identification of Unique Issues • Maintenance of traffic • Phase I • NB/SB US 27 construction • Construction bridge • Ramp C • Bypass ditch • Portion of ramp for SR 80 • Drainage • Portion of ponds 1A, 2, 3, and 75 Awareness/Approach to Project

  22. Awareness/Approach to Project • Identification of Unique Issues (10 Points) • Maintenance of Traffic • Phase I Awareness/Approach to Project

  23. Awareness/Approach to Project • Identification of Unique Issues • Maintenance of traffic • Phase II • Connect NB US 27 to ramp C • Temporary drainage and outfall structures • Remove overhead truss signs Awareness/Approach to Project

  24. Awareness/Approach to Project Identification of Unique Issues (10 Points) Awareness/Approach to Project

  25. Awareness/Approach to Project • Identification of Unique Issues • Maintenance of traffic • Phase III • Construct SB US 27 mainline • Ramp B • Relocate intersection of existing flashing signal • Complete pond 1A Awareness/Approach to Project

  26. Awareness/Approach to Project Awareness/Approach to Project

  27. Awareness/Approach to Project • Identification of Unique Issues • Maintenance of traffic • Phase IV • Ramp A • Remove temporary pavement • Install new signal • Place friction course asphalt • Final signing/striping Awareness/Approach to Project

  28. Awareness/Approach to Project Awareness/Approach to Project Awareness/Approach to Project

  29. Awareness/Approach to Project • CPM schedule goes here Awareness/Approach to Project

  30. Awareness/Approach to Project • CPM schedule goes here Awareness/Approach to Project

  31. Awareness/Approach to Project • CPM schedule goes here *Includes mobilization to job Awareness/Approach to Project

  32. Awareness/Approach to Project • Identification of Unique Issues • Environmental (Brian Monkelbaan – FDOT) • Contamination (Ray Nottingham – FDOT) • Permits (general and specific conditions) • Stormwater Pollution Prevention Plan • NPDES • Notice of Intent • Contractor/subcontractor certification forms • Inspection reports • Endangered Species • Gopher Tortoise • Caracara bird • Burrow Owl • Eastern Indigo Snake • Florida Scrub Jay Awareness/Approach to Project

  33. Awareness/Approach to Project • Identification of Unique Issues • Hybrid project – SR 776 at San Casa Drive • New mast arms and controller cabinet • New camera detection equipment • Widening SW quadrant for improved turning radius • New pedestrian signals • Drainage Awareness/Approach to Project

  34. Awareness/Approach to Project • Leadership • Decision Making • Two Professional Engineers • Take Ownership of the Project • Partnering • Preconstruction Meeting Awareness/Approach to Project

  35. Awareness/Approach to Project • Public Involvement • Public contact log • Tracker letters • FDOT Public Information office • Project website Awareness/Approach to Project

  36. Awareness/Approach to Project • Communication • FDOT Project Manager • Contractor • Utilities • Project stakeholders • Public • Media Awareness/Approach to Project

  37. Awareness/Approach to Project • Timely Completion • Budget • Value engineering • Elimination of unnecessary work • Management of CEI contract • Troubleshooting • Problem-solving ability Awareness/Approach to Project

  38. Awareness/Approach to Project • Documentation • Daily reports of construction • Controlling items of work • MOT reports • Summary of daily reports • Weekly engineer’s reports • EDMS / Hummingbird • Drawing control logs • Issues and RFI logs • Field books • Density log books • Pile logs • Jobsite photographs • Site Manager • LIMS • Meeting minutes • CPPR Awareness/Approach to Project

  39. Awareness/Approach to Project • Change Orders, Claims and Unforeseen Work • Proactive claims avoidance • Supplemental agreements • Engineer’s estimate / entitlement analysis Awareness/Approach to Project

  40. Awareness/Approach to Project • Public Safety • MOT • Project hazards • Advance warning • Emergencies Awareness/Approach to Project

  41. Awareness/Approach to Project • Quality Review Schedule • At project start up • Quality Assurance Plan submitted to FDOT within 30 days after Notice to Proceed. • Initial QA Review within first 60 days • Six-month QA reviews • Written report to FDOT PM, Tim Hendrix, P. E. within 14 days after review. Contract Support Specialist Senior Inspector Senior Project Engineer Corporate Quality Assurance Manager Inspector Project Administrator Awareness/Approach to Project

  42. Awareness/Approach to Project • Innovative Concepts • Project operation plan • Developed prior to project start • FDOT job guide schedule • FDOT guidelists • Traffic phase sign checklist • Critical Item Timeline • Public Relations • Website updates • Facebook/Twitter Awareness/Approach to Project

  43. Awareness/Approach to Project • Innovative Concepts (10 Points) • Dailies summary spreadsheet Awareness/Approach to Project

  44. Awareness/Approach to Project • Innovative Concepts • CPM Snapshot Awareness/Approach to Project

  45. Proposed Staffing • Proposed Staffing • Quantity Proposed • Availability of Staff • Qualifications/Certifications of Staff • Quality/Experience on Similar Projects • Team’s Past Performance on Similar Projects Proposed Staffing Awareness/Approach to Project

  46. Proposed Staffing Proposed Staffing Awareness/Approach to Project

  47. Proposed Staffing • Subconsultants • Allied Engineering & Testing (DBE) – Materials testing and asphalt plant inspection • Cella Molnar & Associates (DBE) – Public involvement • E.F. Gaines Surveying Services (DBE) – Survey • Foundation & Geotechnical Engineering (DBE) – Geotechnical • T.Y. Lin International – Inspection support E&R commits to a minimum of 14% DBE participation. Proposed Staffing Awareness/Approach to Project

  48. Proposed Staffing Availability of Proposed Staff Qualifications/Certifications Proposed Staffing Awareness/Approach to Project

  49. Proposed Staffing Quality/Experience on Similar Projects Proposed Staffing Awareness/Approach to Project

More Related