Verification and validation of the CM-SAF radiation at the top of atmosphere workpackage

Verification and validation of the CM-SAF radiation at the top of atmosphere workpackage. S. Dewitte Royal Meteorological Institute of Belgium. Overview. Purpose CM-SAF TOA facility Satellite input data Architecture - software design Architecture - flowchart Tested unit components

taya
Download Presentation

Verification and validation of the CM-SAF radiation at the top of atmosphere workpackage

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Verification and validation of the CM-SAF radiation at the top of atmosphere workpackage S. Dewitte Royal Meteorological Institute of Belgium Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  2. Overview • Purpose CM-SAF TOA facility • Satellite input data • Architecture - software design • Architecture - flowchart • Tested unit components • Output products • Needed for integration • Conclusions Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  3. Top of the atmosphere Reflected Solar Top of the atmosphere Incoming Solar Top of the atmosphere Emitted Thermal Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  4. Satellite input data • TIS: pre-existing Total Solar Irradiance measurements • TRS/TET : • geostationary over Europe+Africa:METEOSAT 7, GERB • polar: CERES Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  5. Total Solar Irradiance Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  6. GERB-like images from METEOSAT 7 • see http://gerb.oma.be Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  7. CERES TRS Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  8. CERES TET Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  9. Software design Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  10. TIS - flowchart CM_TOA_TIS pre-existing CM_TOA_product Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  11. TRS/TET - flowchart CM_TOA_analyse CM_TOA_meteosat CM_TOA_CERES CM_TOA_merge CM_TOA_product Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  12. Tested unit components • CM_TOA_analyse: non real time processing for TRS and TET • real-time top chain: • CM_TOA_meteosat: for TRS and TET • CM_TOA_ceres: for TRS and TET, for DM, MM and MMDC • CM_TOA_merge: for TRS and TET • CM_TOA_TIS • CM_TOA_product for TRS, TET and TIS Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  13. Aug. 2001 TIS, 12:30 TRS, 12:30 Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  14. Aug. 2001 TET, 11:30 TET, 23:30 Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  15. daily mean, TRS, 18 Aug. 2001 Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  16. daily mean, TET, 18 Aug. 2001 Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  17. monthly mean, TRS, Aug. 2001 Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  18. monthly mean, TET, Aug. 2001 Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  19. Task Manager • Pre-existing executable program ‘startproc’ • Used operationally in RMIB GERB Processing Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  20. Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  21. Conclusions • existing and tested during unit tests: all (17) executable programs for TIS,TRS,TET product generation • pre-existing within RMIB GERB Processing: Task Manager ‘startproc’ • to be implemented for integration: Data Availability Manager functions within selected executable programs Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  22. Tested unit components • CM_TOA_analyse: executables CM_TOA_colocate_ES8 (1) for TRS and TET, CM_TOA_analyse_TET(2), CM_TOA_sort_TRS(3), CM_TOA_analyse_TRS(4) • top chain: sub-chains CM_TOA_meteosat, CM_TOA_ceres, CM_TOA_merge, CM_TOA_TIS, CM_TOA_product. Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  23. CM_TOA_meteosat chain: executables CM_TOA_extract_MS(5), CM_TOA_hbavg(6), CM_TOA_regrid_MS(7) for TRS and TET • CM_TOA_ceres chain: executablrd CM_TOA_extract_HDF4(8), CM_TOA_grid_ES9(9), CM_TOA_lhour2UTC(10),CM_TOA_shiftfill(11), CM_TOA_rescale for TRS(12) and TET, for DM, MM and MMDC Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

  24. CM_TOA_merge chain: executables CM_TOA_mask(13), CM_TOA_merge(14) for TRS and TET • CM_TOA_TIS chain:executables CM_TOA_tis(15), CM_TOA_hbavg, CM_TOA_lavg(16) • CM_TOA_product: executable CM_TOA_product(17) for TRS, TET and TIS Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002