An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Boston Water and Sewer Commission ACEC April 11, 2013

  2. Capital Improvement Program • 3-Year Program • One Year’s Worth of Detailed Data • Shows Project Amounts, Schedules

  3. Consultant Selection • Prequalified List • Selection Committee • Selection Process

  4. WATER SYSTEM • Use of Real Data to Choose Pipes • New Lining Technologies • Leak Detection • New Methods of Pipe Testing

  5. CMOM • Increase in Pipe Inspection • SSO Control • Grease Control • Cleaning • Data Management

  6. STORMWATER MANAGEMENT • Construction Site Management • Illegal Connections • Stormwater Control in Public Ways • Infiltration During Sewer Construction • Partner with City of Boston • Private Development • Individual and Creative Designs

  7. FUTURE TRENDS • Scaling Back of Sewer Separation • Increase in Sewer and Drain Work • Increased use of Modeling • Blending of Projects