1 / 12

Town of Lunenburg Sewer Commission

Town of Lunenburg Sewer Commission. Comprehensive Wastewater Management Plan Project Meeting January 31, 2007. Kevin Olson, P.E. Abigail Charest, P.E. Jason Jancaitis, P.E. Agenda. Introduction DEP Revisions to Sewer Permitting Phase II – Alternatives Analysis

Download Presentation

Town of Lunenburg Sewer Commission

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Town of LunenburgSewer Commission Comprehensive Wastewater Management Plan Project Meeting January 31, 2007 Kevin Olson, P.E.Abigail Charest, P.E.Jason Jancaitis, P.E.

  2. Agenda • Introduction • DEP Revisions to Sewer Permitting • Phase II – Alternatives Analysis • Draft Phase I – Review Steps • Draft Phase I – Report Review • Questions and Answers

  3. Introduction • Public Participation • Webpage • Public Meeting • Water Supply Analysis/Stantec Report • Water Balance – Entire Town • Schedule • SRF Status

  4. DEP Revisions to Sewer Permitting • Old Requirements: • DEP Permit required for any Sewer Extension • DEP Permit required for most Sewer Connections • Detailed DEP review • Lengthy review/approval timeline

  5. DEP Revisions to Sewer Permitting • New Requirements: Sewer Connections • <15,000 gpd – Local Level Approval • 15,000-50,000 gpd – Self Compliance Certification • >50,000 gpd – Sewer Connection Permit Sewer Extensions • <1,000 feet - Self Compliance Certification • >1,000 feet – Sewer Extension Permit • Reduced Approval Timeline • Town Involvement for Compliance Certification • Engineer to “Certify” Compliance • DEP Considering Workshops

  6. Phase II Alternatives Analysis • Schedule • Submit Technical Memos • Potential Wastewater Management Alternatives • Screening of Potential Alternatives • Alternatives to be reviewed in Phase III and potential site selection • Phase II Report • Proposed Alternatives • Collection • Treatment • Effluent Disposal • Review Criteria (see letter) • Technical • Environmental • Institutional • Economics/Cost

  7. Draft Phase I - Review Steps • Town Boards Submit comments to Sewer Commission • Work with Boards to Answer Questions and Gain Consensus • Sewer Commission to Compile Comments • Sewer Commission – Draft a Final Comment Letter which includes proposed edits to Draft Report • Wright-Pierce - Response to Comments and submittal of Water Supply Assessment and Water Balance • Sewer Commission Meeting to “Finalize” Draft Phase I Report • Issue “Final” Draft Phase I Report to Town and DEP • Public Meeting Establish Schedule

  8. Draft Phase IReport Review • Tier 1 • Title 5 Ranking Layer • Conditional Passes/Variances • Conventional Systems • I/A systems to be review in Phase II • MGL Chapter 83 • BOH Regulations • Community Character • Frequent Pumpings • Tight Tanks • Planning Projections • Developable land • Flow Projections & I/I

  9. Questions and Answers

  10. Wastewater Management System Alternatives • Regional Solutions • Centralized Treatment • Decentralized Treatment • Community Systems • I/A Systems • Septage Management Plans

  11. MGL Chapter 83 • BOH –Title 5 • May allow property owner to stay with onsite treatment and not require offsite solution • Property owner can connect, if desired • Add rooms • Increased water use • Legislative Change • Allows the Town to deny sewer connection requests • Allows the design of offsite solutions based on need

  12. Population Projections 956 planned units 1,579 additional residents per EOEA projections 3,555 existing units 2005 Actual: 9,554 2025 EOEA Projection 11,133 Existing Planned Developments Basis for 2026 Projected Flows

More Related