1 / 8

A standard ontology for Units of Measure – status: 24 Sept 2009

A standard ontology for Units of Measure – status: 24 Sept 2009. Ed Barkmeyer NIST. Activities. Requirements gathering Language selection Literature search – available models Initial draft Standards development organization project. Requirements gathering.

teague
Download Presentation

A standard ontology for Units of Measure – status: 24 Sept 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A standard ontology for Units of Measure – status: 24 Sept 2009 Ed BarkmeyerNIST

  2. Activities • Requirements gathering • Language selection • Literature search – available models • Initial draft • Standards development organization project

  3. Requirements gathering • Two Web conferences, 7 presentations,many emails • No written draft of requirements yet • Responsible party: Ed Barkmeyer

  4. Language Selection • Ontology language: • OWL v2 (possibly OWL/Full, i.e. + RDF) • parallel axiomatic formulation in CLIF • Graphical representation for presentation and discussion • UML (UML Profile for OWL)

  5. Literature Search (1) • Standard Reference: VIM = International Vocabulary for Measurements • Available ontologies • DOLCE • QUDT • BFO • others?

  6. Literature Search (2) • Other formal models in proposed standards • UCUM • UnitsML • QUDV • Analysis and comparison • not started • Responsible parties: ? (Ontolog community)

  7. Draft Specification • Current draft: 17 August 2009 • wiki: • state: Strawman • from VIM and other models and discussion • Review and Comment • occasional emails • Next Draft: ? • Responsible Editor: David Leal

  8. Standards Development Project • Standards body identified • not started • Formal memberships, sponsors identified • not started, depends on body • Project initiation documents developed • not started, depends on body • Responsible team • not identified

More Related