60 likes | 145 Views
MAMMA planning for 2012. Hardware. 1 m wide chamber: Needs CERN PCB workshop machines (April 2012) 1.2 m coverlay material ordered Small prototypes to finalize constructional issues 2D readout structure Finalization of resistive values Mesh-less MM, possibly for 2 nd coordinate
E N D
Hardware • 1 m wide chamber: • Needs CERN PCB workshop machines (April 2012) • 1.2 m coverlay material ordered • Small prototypes to finalize constructional issues • 2D readout structure • Finalization of resistive values • Mesh-less MM, possibly for 2nd coordinate • Full-size Small Wheel module 0 • Two multilayers (CERN) • Support/spacer structure (Frascati?) • Alignment (Saclay, Brandeis ?)
Ageing studies • X-ray tests, continued (CEA Saclay) • High rate environment • High spark-rate test • Alphas in gas? • Nominal HV • Full-size chamber irradiation • When & where?
Test beam • H6 • Two test beam periods of 10 days each requested Mid July Mid October • Neutron beam (Demokritos, Garching, …) • Gamma beams at Saclay, CERN?, Dubna?, …
Electronics • VMM1 chip (BNL) • First submission ready 29 Febr 2012 • Chip available in summer 2012 • 2nd submission ? Fall 2012? • MMFE card for testing and final detector (U Arizona) • GBTx card (?) • Others
DAQ & software • SRS • Integration in ATLAS • DCS