An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EH&S Readiness SANE Safety Review Jlab June 26, 2008

  2. Sane Documentation • COO : Conduct of Operations • ESAD: Experiment Safety Assessment Doc. • Installation COO • Target TOSP: Tests in Hall before exp. All have been updated to address SANE specific issues and circulated to a core group for evaluation: S. Wood, W. Kellner, B. Manzlak, M. Seely, H. Areti, P. Bosted

  3. ESAD Hazards and Hazard Mitigation for SANE specific components • Polarized Target • Beta Detector • BigCal • Cerenkov • Hodoscope • Forward Tracker • Chicane • Downstream : Dump and Helium Bag

  4. TOSP Needed for period just prior to start of exp. (7/15-9/30) Hazards • High Magnet Field • Liquid Helium • High Voltage • Microwaves • Thin Vaccuum windows • Elevated Platforms

  5. TOSP Needed for period just prior to start of exp. (7/15-9/30) Hazard Controls when Magnet is Energized • All work coordinated with JLab Target Group. • Crane operation not permitted • Target Expert present restricting access to target platform at all times during restricted access. • All high V terminals shielded. • 1/4” Polycarb shields on target window. • Construction fence barriers placed around all sides with warning of high B field. • All access points to target obstructed with chains. Signage displaying hazards. • Signage at all access points to the hall.

  6. RSAD Small RAD footprint 8% of boundary lim

  7. Summary Links to Documents and source on Front Page of SANEwiki http://hallcweb.jlab.org/experiments/sane/wiki/ “Installation and Documents”