An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Linac4 connectionWork to be done and draft planning JBL-12/09/2013 JBL - 12/09/2013

  2. 2 different areas. • LBE line upgrade • Linac2/Linac4 interface JBL - 12/09/2013

  3. Linac4/Linac2 interfaceWhat to bedone? • Shieldingwall • Emergency exit • Château • Chicane JBL - 12/09/2013

  4. Linac4/Linac2 interface JBL - 12/09/2013

  5. LBE upgrade JBL - 12/09/2013

  6. Draft Planning • 4 weeks for hardware and beam commissioning (very conservative considering the TL will have been already commissioned up to the debuncher (H- stripping test stand). • Time needed for the L2/L4 : 7 weeks • Time needed for LBE : 4 weeks (cool down not taken into account!). • Beam could be delivered to PSB 11 weeks after the Linac2 shut down. • Work in the LBE area cannot be done if ions in the PS. • If an ion run right after Linac2 shutdown, no cool down time necessary for the LBE work. JBL - 12/09/2013