An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMu Slicetest Meeting May 3, 2006

  2. SX5: ME+1 (12+6) All chambers timed in Finalizing ME1/3 timing Calibration data available for ME+1/1 and ME+1/2. Next: ME+1/3 ME+2 (5) ME+3 (4) No changes Green Barrack Trigger No changes TTC No changes (GB cont’d) FED 4 DDUs (all in use) non standard set-up: one DDU per peripheral crate (easier diagnostics) Temporary layout for DDU #3 and #4: #3: all ME1/1 and ME1/2 chambers #4: all ME1/3 chambers Only until next Global DAQ run DCC firmware updated Waiting for DAQ validation run Local DAQ two DAQ PCs. each takes care of 2 spy-channel inputs all 4 spy channels are read out FMM No change Global DAQ overnight run this week Problem with FRL after HCAL installation caused power failure on FRL/FMM racks. sTTS got nicely raised after the LTC detected a “disconnect”  Frans Meijers et al. are looking into this. status

  3. Short term plans • YE+1 • finish calibration of all ME+1/3 chambers • To do: ME+1/1 HV scan and HE-integration tests (not sooner then next week) • Global DAQ runs • FED (this week) • set-up 2nd S-Link in DCC • rearrange DDUs: each DDU takes care of one PerCr • easier diagnostics • ME+2 and ME+1a in one S-Link while ME+3 and ME+1b in the 2nd S-Link • YE+2 (start: end of this week) • replace TMBs and RATs with production versions • fill up crates: 2x9 chambers • Maraton powersupply modification: when is downtime acceptable? • Redo calibration on all chambers • Green Barrack (next week) • prepare Local DAQ farm layout • prepare removal desktops (emuslice04 and dqm machine)

  4. Open Issues • Local DAQ stable running • reading from 4 DDUs • interfacing: cscSV integration, standalone GUI • Peripheral Crate Core Lib • tag & release core/applic lib • rearrange directory structure (reflect core/applic separation) • documentation … • Local DAQ mini-farm • Proposal is circulating • emuslice02 -> emudaq/emuserver • central point of access for all local daq data • RAID disk (~1TB) for temporary storage • DQM, CASTOR and Fermilab’s dCache scripts • hosts the central “slice” account, to be used by all other clients • possibly adding a few other centralized accounts, e.g. “dcs” • emucom01 & emuslice06 -> emudaq01 & emudaq02 • data communication with emudaq over EMU-LAN (10.0.0.x) • E-Log: everybody who works on the SliceTest/MTCC should start using the central E-Log facility … now. • http://cmsdaq/elog and select Subsystems/CSC • use your AFS credentials to view entries • create an account (don’t use the same password as your AFS)

  5. Important Dates • Friday May 19: Comprehensive MTCC readiness review • hardware and software readiness of each subsystem • No official changes in MTCC schedule.

  6. Round Table