310 likes | 533 Views
DETRITIATION in ROMANIA. INCDTCI ICSI Rm. Valcea November 2009. EUROPEAN UNION FZK, Germany CEA, France ICIT, IFIN HH, Romania ITER JET EU – Fusion R&D. Canada Ontario Hydro AECL/CRL Kinectrics. Russia Military Fusion. Korea Fusion Wolsung TRF. China Fusion. Japan Fusion.
E N D
DETRITIATION in ROMANIA INCDTCI ICSI Rm. Valcea November 2009
EUROPEAN UNION FZK, Germany CEA, France ICIT, IFIN HH, Romania ITER JET EU – Fusion R&D Canada Ontario Hydro AECL/CRL Kinectrics Russia Military Fusion Korea Fusion Wolsung TRF China Fusion Japan Fusion USA Military Fusion TRITIUM MAP
Detritiation in Romania • Experimental Pilot Plant for Tritium and Deuterium Separation (ICSI - TRF) • Cernavoda Tritium Removal Facility (CTRF) • Water Detritiation System for ITER (WDS)
Tritium Removal Facilities in Romania ICSI TRF research & training • CTRF Commercial • WDS Research & commercial?
H2 • HR – Helium refrigerator • CD1, CD2 – Cryogenic distillation Condenser H2O HR Heater Tritiated Feed Water CD P IEC LPCE Column H2, HT CD 1 WDS at ITER ICSI TRF/ CTRF Tritium Depleted Water Tritium Storage System Tritium Analysis System D CD2 2 Boiler MONITORING AND SAFETY SYSTEMS Boiler Links between experimental modules for Tritium and Deuterium Separation Pilot Plant O2 WDS / ITER: LPCE ELECTROLYSES (PERMEATION) CRYOGENIC DISTILLATION H2O, HTO TRF / ICSI, CTRF LPCE PURIFICATION CRYOGENIC DISTILLATION Electrolyser O2 Purifier ICSI TRF – CTRF – ITER WDS CTRF – same technology as ICSI TRF
ICSI - TRF • Technical specification • maximum activity for tritium in heavy water: 30 Ci/kg • detritiation factor of 3 • maximum tritium inventory: 300,000 Ci • inventory of heavy water: 2000 kg/year • minimum D2O feed isotopic: 99.8 % • water feed rate: 4-8 kg/h • tritium inventory in CD: 200,000 Ci (60,000 Ci for commissioning) • design service life: 30 years
ICSI TRF Design DTO HEAVY WATER FROM CNE CERNAVODA MODERATOR D2 CD Purification LPCE DT or T2 Storage D2 D2O Tritium experiments
ICSI TRF Status • Licensed for construction for 30g tritium • Licensed for commissioning for low tritium level – initial start • Tritium on site – 200 kg from CNE Cernavoda • Work procedures and equipment upgrading for facility • Tritium laboratory notification • Environmental laboratory notification
CTRF • It was proposed in 2004 to start the program for a TRF • Basically as is it: a five phase project: • Phase I – Feasibility study – approved in 2007 • Phase II – Design of CTRF – starts in 2008 • Phase III – Procurement & Construction – since 2010 for long term delivery equipments • Phase IV – Commissioning/Training/Operating • Phase V – Decommissioning (with U2 decommissioning) • Technology used – LPCE & CD – similar in Wolsung, Korea and ICIT, Romania • Time to finish (estimated): 2013
CTRF Technical Specification • CTRF will start at 54 Ci/kg • Target: to reduce the tritium content to 10 Ci/kg in 2 years • Detritiation factor 100 • Upgrading possibility for heavy water - from minimum 99.7% to 99.95% • To be used by U1 and possibility to serve also U2. No U3/U4 in actual design • Design for 30 years life with possibility for refurbishment • CTRF will have long term storage capacity for tritium
Differences to ICSI TRF • Design of more than 95 CTRF systems (<25 in ICSI TRF) • Issue of more than 45 basic design and licensing documents • CTRF is connected to U1, but 8 new systems had to be implemented • 5 CTRF licenses to be obtain from local & central authorities and regulatory body CNCAN
Licensing • Initial, at beginning of contract, 3 licenses from CNCAN had to be obtained: location, safety and construction • After discussions, a different approach was approved using the ICSI TRF experience – only 2 licenses from CNCAN • Other licenses – initial approach
Licensing documents issued up-today • Initial design manual of CTRF – based on tritium experience • List of code and standards applicable – based on ASME codes, Canadian standards, Romanian standards • Safety Design Guides for CTRF – in revision • CTRF system classification list - in revision • Seismic qualification of CTRF systems - in revision • List of safety systems and safety related systems - in revision • Risk hazard for CTRF – in revision • CU license (from local authorities) – approved in October 2008 after 3 month • Environment initial documents • PSAR content agreed with CNCAN
CTRF design phase status • 75 % of all systems already designed (different revision) • Main systems: • LPCE system – revision 2 • CD system – revision 2 • Interface systems (HWFS & HWPS) – revision 1/2 • HVAC, ADS, TGHSS, VTMS – revision 0 issued • 3 systems at the beginning (TRS, DMS, AcDS) • Some of support systems in final stage
CD System TRS ADS L4 L3 L2 L1 L0 B1 LPCE System HVAC Shaft Heating System Tritium Storage Building Tritiated water holding tank system
Milestones for CTRF design • Technical project – November 2009 • Final review of TP and issuing final form – December 2009 • PSAR – First edition December 2009, final February 2010 • License for construction/construct of CTRF – April/May 2010 • Detailed design of CTRF – June 2010
ITER - WDS ITER – an important subject to Romania and ICSI • From Romania point of view, materials, water detritiation equipment and systems can be provided to ITER. • Romanian experience can be used for Water Detritiation System, with tritium storage, recombining processes for hydrogen/deuterium/tritium, materials studies or design using professional software CATIA. • Take in account large quantities of tritium from Cernavoda site, Romania can be the major player on European tritium market, having in view that Romania is a European Union member. • Romanian companies can provide services and equipment to ITER • ICSI is on the list of potential supplier for ITER and open to tender
ICSI for ITER • ICSI starts in 2000 the work for WDS • ICSI develop catalyst for LPCE columns in WDS, including endurance tests • Development of components for WDS in CATIA V5 • Training networks for young specialists • “Preparing the ITER Fuel Cycle” • “Tritium Technologies for the Fusion Fuel Cycle TRI-TOFFY”
ICSI for ITER in next future • Most of the items are related to WDS • ICSI will participate in consortium for: • Development of method for highly tritiated water handling in ITER Tritium Plant. Phase 1 • Support for development of Water Detritiation Systems • ICSI will send specialists in EU research centers to support fusion technologies research
Conclusions • Romania developed technologies for tritium and will have a full experimental TRF in next future (by ICSI) • ICSI has the technology for tritium removal facilities and therefore ICSI expertise can be used for ITER/CANDU units • First industrial TRF in Europe will be on Cernavoda site • From Romania point of view, the main source of tritium for ITER is CNE Cernavoda • There is a different approach between ITER and CTRF (ex. site, code and standards, systems), but CTRF expertise can be used for ITER. CTRF will starts before WDS from ITER • For tritium (both ITER and CTRF) a common effort and collaboration is necessary, more than today