1 / 19

Hopewell centre (phase ii)

Hopewell centre (phase ii). A case of sustainable development. location. Locational characteristics. Hopewell centre II is located in zone of transition in Wan Chai Adjacent to CBD A mixed commercial-residential land use zone Mixture of old and new buildings

tevin
Download Presentation

Hopewell centre (phase ii)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hopewell centre (phase ii) A case of sustainable development

  2. location

  3. Locational characteristics • Hopewell centre II is located in zone of transition in Wan Chai • Adjacent to CBD • A mixed commercial-residential land use zone • Mixture of old and new buildings • Inadequate recreational land use in Wan Chai • Well-connected by Queen’s Road East and Kennedy Road in the upper slope • 10-minute walk to the nearest MTR station

  4. The project • Commercial development • Conference hotel • Construction work will commence in 2010

  5. Modified plan 1994 2008

  6. Disadvantages of 1994 design • Great height (315 m) • destroy the ridgeline of HK Island • Density of development is too high • Present road capacity cannot support the high traffic flow • Heavy traffic on Kennedy Road and Queen’s Road East • Poor wind circulation in the area  intensify the urban heat island effect

  7. Advantages of 2008 design • Lower in height • Will not spoil the ridgeline • Lower density of development • Less visual impact • Less burden on road traffic

  8. What changes the plan? • Environmental consideration • To provide a pleasant living environment for Wan Chai residents • Receives strong public opposition concerning traffic condition / environmental preservation and cultural / heritage preservation • Public consultation has been done, e.g. discussion with district board members, setting up website to collect public opinions

  9. Comparison of two designs • 93 storeys • 315 m in height • Total floor space: 164,091m2 • 2,197 rooms • 270 parking space • 55 storeys • 210 m in height • Total floor space: 101,667m2 • 1,024 rooms • 168 parking space 1994 2008

  10. Economic benefits • more commercial / hotels • more job opportunity (4000 jobs during and after construction) • Turning Wan Chai to be a financial centre of Hong Kong • Good to have economic development in an old district • May attract younger generation to move in and revitalize the district

  11. Social benefits • Being a landmark of Hong Kong • More recreational facilities by creating a green park for the public • Public spaces totaling 5,880 square meters (about 63,000 sq.ft.) will be provided. • Preserving the green area at the site between Queen’s Road East and Kennedy Road • spend $20 million on the conservation, plantation or transplantation of trees in the area • Widening of Kennedy Road to cope with increasing traffic • preserve and revitalize the Nam Koo Terrace on Ship Street, a Grade I historic building

  12. Negative Social impacts • Insufficient recreational land use in Wan Chai • Poor infrastructure, road capacity cannot support high traffic flow caused by hotel development  traffic congestion • local residents may object to it as the tall building may block the views • May also lower the price of the flat • May cause land use conflict

  13. Environmental measures • The developer has taken measures to ensure the quality of the living environment • Improving roads, widening pedestrian walkways, providing elevators, etc • Minimize the no. of trees to be cut • Preserve historical buildings • The revised plan follows the principles of sustainable city

  14. Environmental impacts • Large Scale Of Development • visual pollution • Cutting large no. of trees causes greenery to disappear • Pollution is caused, e.g. air / noise / land pollution are caused during construction work • Heavy traffic may induce air pollution and noise pollution

  15. Road improvement projects

  16. Road improvement projects

  17. Road improvement projects

  18. Who’s the winner? Loser? • Local residents? • Government? • Private developers?

More Related