140 likes | 222 Views
WP9: Decision Support System EuroDeSS. Overview and Plans. EuroDeSS Objectives. Overall :
E N D
WP9: Decision Support System EuroDeSS Overview and Plans
EuroDeSS Objectives Overall: • To develop elements of integrated marine services in support of short and long term decisions (crisis response, planning, environmental management) in European seas, based on information products generated by the ECOOP system of systems [downstream services] Specific: • To define the specifications of EuroDeSS, based on existing elements of DeSS operating in European seas • To develop components EuroDeSS in selected targeted areas where elements of such systems already exist (funding limitations) • To operate and demonstrate the value of EuroDeSS for a targeted period • To evaluate the performance of EuroDeSS and assess its impact, in consultation with end-users. Building on developments of national (Polcoms, Moncoze, Poseidon, Adricosm etc) and EU / ESA projects (Mersea_s1, Mersea, Coastwatch, Roses, Marcoast) Using EuroMISS tools and standards, developments of WP5 WP6 & WP7
WP9 structure 18 Partners, 4 Tasks, 15 Sub-tasks, 35 deliverables • Task 9.1: EuroDeSS specifications and standards Keiran Millard - HRW, HCMR, IMR, MET-NO, UREADES • Task 9.2: Development, management and demonstration of EuroDeSS for targeted applications/areas Bruce Hacket / Lars Petter Roed - MET-NO, AZTI-Tecnalia, CEFAS, CMRC, FIMR, HCMR, IMR, INGV, IST, METO, MF, NERSC, NIVA, OC-UCY, TECHWORKS, LIM/UPC, UREADES • Task 9.3: EuroDeSS evaluation including user perspectives Declan Dunne - CMRC, HCMR, HRW, MET-NO, NERSC • Task 9.4: Coordination Kostas Nittis – HCMR
8 EuroDESS application areas • NW Shelf • North Sea • Aegean • Iberian-W.Med • Baltic • Levantine • Adriatic • North Sea Fisheries Safety+oil Fisheries Ecosystem
WP9 Plan & 1-12m Progress Overall Plan • 1-12: Task 9.1 (Specifications) HRW • 9-36: Task 9.2 (Development) MET-NO • 11-36: Task 9.3 (Evaluation) CMRC Progress Months 1-12 • Initiate & Complete 9.1.1, 9.1.2, 9.1.3 • Initiate 9.2 –development and implementation plans • Initiate 9.3 Meetings: • Kick – off (Galway, 1-2 March 07) WP8-WP9-WP10 • WP9 meeting (Athens 22-23 October 07) • WP8.1, 9.1 (UK, 21-22 January 08)
Task 9.1: EuroDeSS specifications and standards In coordination with task 8.1 - EuroMISS Months: 1-12 (+) S9.1.1 - Formalise EuroDeSS requirements (1-6) D9.1.1.1 (Mo6): Use-case document for EuroDeSS S9.1.2 - Model for EuroDeSS deployment and operation (1-12) D9.1.2.1 (Mo10): EuroDeSS system specifications D9.1.2.2 (Mo12): EuroDeSS system design diagrams S9.1.3 - Deployment framework of EuroDeSS application systems (6-12) D9.1.3.1 (Mo12): EuroDeSS deployment manual
EuroDeSS use case ECOOP Annual Meeting, Feb 2008
Task 9.2: Development, management and demonstration of EuroDeSS Months 9-36 S9.2.1 – 9.2.8 : Development at 8 Application areas Months 9-21: From V0 (existing system) to V1 • Connect to EuroMISS • Meet specifications of 9.1 Months 24-27:Operate during TOP (Feb09-Apr09) Months 21-36: V1 to V2 D9.2.X.1 (Mo12): Appl. X : development and implementation plan (R) D9.2.X.2 (Mo30): Appl. X : V1 development and TOP demonstration (P-R) D9.2.X.3 (Mo36): Application X : V2 development (P-R) S9.2.9 - Task 9.2 coordination D9.2.9.1 (Mo10): Report template: Task 9.2 development and implementation plan.
The 8 EuroDeSS applications • 9.2.1: Marine security in the Northwest Shelf seas (MET-NO) • 9.2.2: Ecosystem health in the North Sea – a contribution to marine monitoring and assessment (METO) • 9.2.3: Marine security and ecosystem health in the Aegean Sea (HCMR) • 9.2.4: Marine security in the Iberian coast and the Western Med (MF) • 9.2.5: Ecosystem health in the Baltic Sea (FIMR) • 9.2.6: Marine security in the Levantine Basin (OC-UCY) • 9.2.7: Ecosystem health in the Adriatic Sea (INGV) • 9.2.8: Environmental status support to North Sea fisheries assessment (METO)
Development / Implementation Plan • 2. INTRODUCTION 5 • 2.1. BACKGROUND 5 • 2.2. RESULTS AND PLANNED USE 6 • 2.3. ORGANISATION AND INTENDED READERSHIP 6 • 3. DESCRIPTION OF THE PRE-EXISTING DESS APPLICATIONS (V0) 7 • 3.1. HCMR OIL SPILL FORECAST SERVICE 7 • 3.1.1. DeSS Summary 7 • 3.1.2. Input data 9 • 3.1.3. Products delivered 10 • 4. DEVELOPMENT TO DESS APPLICATIONS V1 13 • 4.1. OIL SPILL RESPONSE SUPPORT FOR AEGEAN 13 • 4.1.1. Summary of the DeSS V1 13 • 4.1.2. Input data and interfacing to EuroMISS 13 • 4.1.3. Products delivered 14 • 5. PLAN FOR DEMONSTRATIONS DURING THE TOP 15 ECOOP Annual Meeting, Feb 2008
Input data: example ECOOP Annual Meeting, Feb 2008
Output products: example Forecasts of oil spill fate Parameter(s): Longitude, latitude and depth of each particle in the sea (Figure 3-2) Evaporated volume of the initial oil Emulisificated volume Volume reached the beach Volume reached the sea floor Spatial resolution: n/a (model is Lagrangian) Temporal resolution (update frequency): The user can select the temporal resolution of the output through a range of values between 1 to 4 hours. Forecast updated under request. Area covered: Aegean Sea (Greece). The model’s domain is extended between 20-29E and 30-41N. Data distribution: Sequential graphs in temporal resolution selected above. The plain ascii model’s results are available under request. ECOOP Annual Meeting, Feb 2008
Task 9.3: EuroDeSS evaluation including user perspectives Months 11-36 S9.3.1 - EuroDeSS evaluation framework To refine the criteria for the evaluation of EuroDeSS (both for deployed services and ability for future services) taking input from 9.1.3.1 D9.3.2.1 (Mo36): EuroDeSS developed services evaluation report. S9.3.2 - EuroDeSS Services evaluation Do the services developed as part of 9.2 meet the requirements of the stakeholder communities ? D9.3.2.2 (Mo36): Update to DeSS deployment manual (deliverable 9.1.3.1). S9.3.3 - EuroDeSS future deployments D9.3.3.1 (Mo36): Report on addition of new services
WP9 Plan – Next 12 months Overall Plan • 1-12: Task 9.1 (Specifications) HRW • 9-36: Task 9.2 (Development) MET-NO • 11-36: Task 9.3 (Evaluation) CMRC Plan for Months 12-24 • Complete 9.1 (small delay) • Continue 9.2: • From V0 to V1 Development for the 8 systems (month 24) • Prepare for demonstration TOP • Initiate 9.3 (evaluation 11-36)