1 / 12

Work shop Ujjain division 6 th Feb 2009

Work shop Ujjain division 6 th Feb 2009. Our VISION of CSC scheme. INDIA Developing 2 Developed country. HARIT KIRANTI SHEWET KIRANTI SOOCHNA KIRANTI 2 KNOWLAGE ERA Leading to more strong and knowledge power house THE INDIA. The Implementation Structure. Govt. of India. MP Govt.

tevy
Download Presentation

Work shop Ujjain division 6 th Feb 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work shop Ujjain division 6th Feb 2009

  2. Our VISION of CSC scheme INDIADeveloping 2 Developed country HARIT KIRANTI SHEWET KIRANTI SOOCHNA KIRANTI 2 KNOWLAGE ERA Leading to more strong and knowledge power house THE INDIA

  3. The Implementation Structure Govt. of India MP Govt. IL & FS IL & FS MPSEDC NICT INDORE

  4. Service Pipeline

  5. Services G2G

  6. Revenue Generation Our emphasis is on sustainable income generation model rather than thrusting on the number game, we have past learning's and want to ensure sustainable revenue generation business for which we have made tie-up for B2C services and all kiosk rolled out are having average income of 1500 to 2000, in certain cases like Bicholi hapsi, Simrol, Barmandal Kiosk operator are making turnover of more than 10000/-.

  7. Connectivity V-SAT in association from Hughes

  8. Infrastructure

  9. Govt.of M.P Govt of India District wise status Work Shop on CSC Project

  10. Govt.of M.P Govt of India • Request to administration to boost up implementation • Linkage with schemes like PMRY, JRY, SRY, SHG’s and lead banks for NREGS Wage distribution, Cooperative, health education schemes. • Village level muster roll, accounting Panchlekha/Tally. • MIS and Data entry for rural development deptt, woman and child welfare deptt., education deptt. Work Shop on CSC Project

  11. Govt.of M.P Govt of India • Linkage with schemes like PMRY, JRY, SRY, SHG’s and lead banks for NREGS Wage distribution, Cooperative, health education schemes. • Village level muster roll,accounting Panchlekha/Tally. Agro input BPL list • MIS and Data entry for rural development deptt, woman and child welfare deptt., education deptt. • Dist level workshops with all dept. Work Shop on CSC Project

  12. Govt.of M.P Govt of India Taking small steps can only lead us to top I wel come you all to walk along with us to kick start Thank You Work Shop on CSC Project

More Related