1 / 2

Broadband Developments Road Map: January 2013

I can be found at www.btwholesale.com. Broadband Developments Road Map: January 2013. Release AG 18 th March 2013. Release AH 13th May 2013. WBC FTTC: Changes to Standards and Flexible Appointments (BB684-13). CP action needed.

tex
Download Presentation

Broadband Developments Road Map: January 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I can be found at www.btwholesale.com Broadband Developments Road Map: January 2013 Release AG 18th March 2013 Release AH 13th May 2013 WBC FTTC: Changes to Standards and Flexible Appointments (BB684-13) CP action needed FTTC: BB Availability Checker - Cabinet unavailability (BB574-12) WBC FTTP external engineering vist completed notification (BB684-13) BBCR XML reporting changes (BB574-12) CP Changes recommended WBC FTTC Automation of cancellation of Openreach rejections(BB684-13) WBC FTTC LORN for Solution Based Services (BB574-12) Stop Sell Downstream QoS and WBC Assured (BB594-12) Stop Sell End User Speed Control (BB593-12) WBC FTTP removal of battery back up (BB574-12) 9th list of exchanges for IPstream Connect and WBMC over IPsC retirement (BB592-12) No Impacton CPs WBC FTTP ONT dialogue service (BB574-12)

  2. I can be found at www.btwholesale.com Broadband Release Schedule 2012/13 The above dates are not confirmed until 90 day legal notification has been published

More Related