An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Estimation of resources (personnel, material, space) needed for PACMAN Summary (kCHF) CERN, 17/06/2013, HMD, SR, AC, MM, NCL, MW, AG

  2. Summary of M to P ressources (FTE)

  3. WP1 Metrology & Alignment Estimation of resources (personnel, material, space) needed for PACMAN ESR1.1 01/01/2014 - 31/12/2016 AC, 22/05/2013

  4. LVDT – Linear Variable Differential Transformer Linearencoders Glass ceramicsclales LSP S4 Measurementhead

  5. WP1 Metrology & Alignment Estimation of resources (personnel, material, space) needed for PACMAN ESR1.2 01/01/2014 - 31/12/2016 ESR1.3 01/01/2014 - 31/12/2016 HMD, MM, 03/05/2013

  6. FSI instrumentation Micro Triangulation Fiducials for micro Triangulation

  7. Resource Estimation (personnel, material, space) for PACMAN project WP2 Magnetism ESR2.1 05/01/2014 - 31/04/2017 ESR2.2 05/01/2014 - 31/04/2017

  8. Resources Estimation (personnel, material, space) for PACMAN project WP3 Precision Mechanics and Nano-Positioning ESR3.1 01/03/2014 - 31/02/2017 ESR3.2 05/01/2014 - 31/04/2017 Note (1): Mechanics or Software & DAQ skills assured by ESR3.2

  9. Resources Estimation (personnel, material, space) for PACMAN project WP4 Microwave Technology ESR4.1 01/03/2014 - 31/02/2017 ESR4.2 05/01/2014 - 31/04/2017 MW, 21/05/2013

  10. CTF3 Cavity BPM Installation beam tube with bellows (to be fitted with a stretched wire) ESR4.1 cavity BPM step motor controlled translation stages MW, 21/05/2013

  11. Spacerequirements for PACMAN • To improve team efficiency and make the project a real success: • ESRs offices located at the same place (and not near their supervisors, except during the 6 first months – 1 year), e.g. 5 offices for 2 persons. Even «Algecos» could be ok. • At least 3 laboratory rooms (~4m x 4m) nearby (or one large laboratory room), hosting the following test benches: • Magnetic measurements • RF measurements • Assembly / final mock-up • Micrometric alignment test setup • Nano-positioning • Seismic sensors • Requirements for the labs: • Thermally stable ~ 20±2 °C • Low level vibration and ground motion(potential sites can be easily checked by the CLIC Stabilization Team) • Duration (2014-2017)

More Related