EC 307: Economic Policy in the UK Week 11: Procurement
General outline, 1 • The procurement problem(s): • The political problem – procurement as a sure-fire source of deeply embarrassing stories • The practical problem – procurement as government business • The policy problem – procurement as an instrument of (environmental, industrial, innovation, trade) policy • The theoretical problem – procurement as an exercise in mechanism design • The simple theory of procurement • What is procured • Who supplies it and why • How is it procured • What can go wrong? • What can be done about it? • Procurement and competition EPUK Lecture 1
General outline, 2 • The historical laboratory – defence procurement • The Modern challenges – eGovernment, outsourcing, etc. • The global constraints – the European Directives and the GPA • The policy response – the Office of Government Commerce • Some initial reading: • Laffont, Tirole: A Theory of Incentives in Procurement and Regulation, MIT Press, Chapters 1 and 2 – other references to be added • De Fraja and Hartley “Defence Procurement: Theory and UK Policy” Oxford Review of Economic Policy 12(4): 70-88 • OECD Report on Competition and Procurement – on module website • UK National Audit Office: • Rapid support procurement http://www.nao.org.uk/publications/nao_reports/03-04/03041161.pdf • IT procurement http://www.nao.org.uk/publications/nao_reports/03-04/0304877.pdf • OGC performance - http://www.nao.org.uk/publications/nao_reports/03-04/0304361-i.pdf • Modernising Procurement - http://www.nao.org.uk/publications/nao_reports/98-99/9899808.pdf • UK MOD - http://www.mod.uk/issues/sdr/procurement.htm EPUK Lecture 1
The procurement problems – faster, cheaper, better? • Horror stories: • Waiting for a submarine, waiting for a plane • The £100,000 screwdriver – cost overruns • IT procurement in the UK – why is it so hard • Corruption and procurement • Procurement as government business: • Who ‘owns’ the procurement function – customer 1 and customer 2 • Procurement as part of outsourcing • Value for money in procurement • Procurement as risk-taking: innovative goods and services • Risk transfer • Collecting and exploiting market power • Private sector examples – reverse auctions EPUK Lecture 1
Problems, continued • Procurement as an instrument of policy • The demonstration effect: energy-efficient buildings, PNGV • The launching customer role – biometrics • “Jobs for the boys” and “Buy British” – procurement as: • Disguised state aid (US aircraft, computers, etc.) • Structural policy (SME preference, national champions) • Underwriter of venture capital • Maintainer of industrial and research capabilities • Procurement and innovation policy (pull-through) • Procurement and trade policy: why and how much local preference? • Procurement and competition policy – more anon EPUK Lecture 1
Procurement as a sandbox for theory • The contractarian perspective • The mechanism design perspective • Step 1: what are the objectives of procurement? • Value for money (VFM) – traditionally narrow, but raises deep questions about measurement of cost and value • Competition – strong belief in the efficacy of competition to resolve information asymmetry and monitoring problems associated with contract incompleteness • Innovation – to bring in better – or fit-for-purpose – solutions and to facilitate change management • Greening and other facets of ethical government • Maintaining sectors and competitiveness • Laying off risk – the ‘make or buy’ question • Security of supply • Things the market cannot (yet) supply (milspec) EPUK Lecture 1
The procurement life-cycle • Step 2: what is procured? • Goods and services and whole systems • Procurement on the government’s own account or on behalf of others (e.g. NHS) • Procurement of R&D • Ongoing vs. strategic procurement • Step 3: the process • Identifying needs and formulating requirements • Market analysis • Choosing a mechanism (spot purchase, long-term contract, tender procedure(s), auction, competition…) • Specifying an offer • Evaluating the responses • Selection, negotiation and contracting • Monitoring • Acceptance • Subsequent exploitation • Re-tendering and lessons learnt EPUK Lecture 1
What’s different about the public sector? • Monopsony position • Non-transferable risk • (for some items) • Development cost >> unit cost • Many parallel ‘offices’ • Buying and selling on ‘mixed’ markets • Constraints on partnering • Difficulties in self-supply • Different opportunity cost of finance, legal position • Informational and cultural asymmetries • High costs of monitoring, negotiation, enforcement • Market imperfections (esp. with ‘thin’ supply side) • Some markets with special rules – e.g. defence EPUK Lecture 1
A simple model – buying from a monopolist • Procurement as analogous to regulation – just set the price! • Price = cost + profit • Cost is endogenous: • Depends on (hidden) effort • Depends on (hidden) information • Determined by contractual incentives • Contracts can only depend on verifiable things • Two polar situations: • Fixed price contracts – provide maximal (perhaps too great) incentives for cost reduction, but large profits in exchange. All cost risk on firm. • Cost-plus contracts – no incentive to control costs, but insures firm against risk (e.g. innovation, inflation). Allows tight control of profits, not of costs. EPUK Lecture 1
Model, 2 • Two simple representations: • P = a + b*C(e, q) – e is effort, q is hidden information • P = a - b[C(e,q) – Cest] – target cost pricing • Fixed-price is b = 0 or b = 1; cost-plus is b = 1 or b = 0 • b is the “power” of the contract • Low-powered contracts tend to be used early in the project life cycle and more for high technology items than for nonstandard equipment • The optimal contract (not derived here – can happily do this if desired) involves: • Offering a schedule a(b) and letting firm pick the b it wants • Or schedules a(Cest) and b(Cest) and letting firm estimate C • This fits realities: tenders involve variants and buyer and seller (re) negotiate. • Main result: firms with higher efficiency (q) will: • Choose higher-powered contracts • Reap larger profits (information rent) EPUK Lecture 1
More careful treatment – optimal contracts with a monopoly supplier with 2 ‘types’ • Cost = q – e; • Disutility Y(e) [Y’(e) > 0; Y”(e) > 0; Y(0) = 0; lim as e →0Y’(e)=]. • Assume first that cost can be observed; contractor gets U = P - Y(e) > 0 (value of outside option – independent of q) • Shadow cost of public funds is l > 0; agency gets S - (1+l)(P+q-e) • Social welfare is W = S - (1+l)(P+q-e) + P - Y(e) = S - (1+l)(q-e+ Y(e)) - lU • Social welfare criterion does not favour leaving contractor with excess profit. EPUK Lecture 1
Solution under complete information • If the agency knows q and observes e, the maximisation of W s.t. U > 0 gives • Y’(e) = 1 (e = e*) • U = 0 (P = Y(e*)) • Marginal disutility of effort = marginal cost savings; contractor keeps no rent. • This can be achieved by many contracts: • Stipulate e* and enforce with large penalty • Use fixed-price contract P(C) = Y(e*) - (C – C*), where C* = q – e* • This gives perfect incentive for cost-minimisation • This also extracts all of contractor’s rent. EPUK Lecture 1
Incomplete information • If the agency knows that q is either high (q+) or low (q-) and observes cost. • Contract is based on two observed variables P and C only • In principle, both ‘depend’ on the contractor’s type: P(q), C(q) • Let U(q) = P(q) - Y(q – C(q)) be the contactor’s ‘truthful’ utility • Incentive compatibility (IC): each type of firm prefers to be truthful: • P(q+) - Y(q+ – C(q+)) > P(q-) - Y(q+ – C(q-)) • P(q-) - Y(q- – C(q-)) > P(q+) - Y(q- – C(q+)) • Or Y(q- – C+) + Y(q+ – C-) - Y(q+ – C+) - Y(q- – C-) > 0 • …which shows (by integration) that C+ > C- - the optimal cost is nondecreasing in type. • We also need individual rationality (IR) – each type gets at least 0 • In the event, we only need individual rationality for the low type and incentive compatibility for the high type • The social welfare function when the contractor has type q is now:W(q) = S – (1+l)[P(q) + Y(q-C(q))] – lU(q) • Suppose the agency thinks that the contractor is inefficient (low q) with probability p and tries to maximise W subject to IC and IR. EPUK Lecture 1
Solving the problem • Rewrite IC for high type as: U-> U+ + F(e+), where F(e) = Y(e) - Y((e – q+ + q-) – this function is increasing and convex, so the objective is concave • The function F determines the rent enjoyed by the efficient type relative to the inefficient type via the ‘slack’ – reduced disutility of effort. The fact that is is increasing means that the efficient firms gets more rent, the higher is the power of the scheme. • The agency must now choose the cost and utility levels for both contractor types to maximise welfare s.t. the relevant constraints. This gives: • Y’(q- – C-) = 1 (e- = e*) • Y’(q+ – C+) = 1 – (l/(1+l))(p/(1-p))F’(q+ - C+), so e+ < e* • The efficient type devotes efficient effort and gets positive rent • The inefficient type exerts less effort and gets no rent. • The rent is there because the efficient type can (more cheaply) imitate the inefficient type EPUK Lecture 1
A picture efficient efficient P P inefficient inefficient q+-e* q+-e* q--e* q--e* C q+-e+ C EPUK Lecture 1
Some methodology observations • The equilibrium is separating – different types choose different contracts and thus reveal their types. • The agency would want to renegotiate – reducing the price on offer – this is ruled out by assumption (legal or reputation reasons) • The direct mechanism is to offer a supply contract P(C) – an alternative is to offer the contract based on q: {P(q), C(q)} – the firm accepts by announcing qo, producing at cost C(qo) and getting the agreed price. The parties could renegotiate between the announcement and the production. If the firm announces q- there is no scope for this, but if the firm has revealed q+ both parties could benefit from renegotiation. Because the agency and the firm would prefer to have the firm exert more effort in exchange for more money – but this would destroy incentive compatibility. • This happens in real contracts where there is initial R&D. EPUK Lecture 1
Interpretation • This is a strength, not a weakness of fixed-price contracts: it amounts to gain sharing between firm and customer – profit and power are both correlated with (unobservable) efficiency (q). • This is only optimal if the firm’s profits do not damage the customer’s objective function - a function of the ‘shadow price of public funds’ • Side remark – this should be the internal rate of return on the best unfunded public project • The gain sharing holds if b < 1, but there is ‘no distortion at the top’ (b = 1 or q = qmax) • If there is no shadow distortion, fixed price contracts are always optimal • Maximal incentive for production efficiency • Firm’s rent is “just a transfer” • … but there is always at least a political shadow price EPUK Lecture 1
Other remarks and some problems that arise • Contracting agencies do not maximise societal welfare • There is a possibility of deadweight loss • There are possible dynamic distortions as well – if we take the regulatory analogy seriously, we could see an Averch-Johnson effect • The capture problem: the agency’s objective functions grows to resemble the supplier’s: • Corruption, bribes, political power • Revolving door • Personal relationships • Mutual understanding (trade-off between contractual rigour and partnership) • Information distortion EPUK Lecture 1
More generic problems • Static problems • Hold-up • Foreclosure • Lock in • Dynamic problems • Inappropriate (too weak or too strong) incentives to minimise cost • Mismatch of marginal cost and marginal willingness to pay (monopoly pricing, reversal of agency, allocational inefficiency) • Loss of effort/innovation incentives near the end of the contract – or too-strong incumbent advantage • Amount, nature and ownership of intellectual property rights and other rights to intangible property created during the contract EPUK Lecture 1