60 likes | 137 Views
CCAMP Working Group. Online Agenda and Slides at: http://www.olddog.co.uk/63/ccamp.htm. Agenda (1 of 2). Administrivia (10 mins) Adrian & Kireeti Status of WG (5 mins) Adrian & Kireeti ITU-T Liaison report (10 mins) Lyndon WG drafts Status and Plans Inter-domain
E N D
CCAMP Working Group Online Agenda and Slides at: http://www.olddog.co.uk/63/ccamp.htm 63rd IETF Paris August 2005
Agenda (1 of 2) • Administrivia (10 mins) Adrian & Kireeti • Status of WG (5 mins) Adrian & Kireeti • ITU-T Liaison report (10 mins) Lyndon • WG drafts Status and Plans • Inter-domain • Stitching (5 mins) draft-ietf-ccamp-lsp-stitching-01.txt Arthi • Inter-domain Signaling (5 mins) draft-ietf-ccamp-inter-domain-rsvp-te-00.txt Arthi • Per-Domain-Path-Computation (5 mins) draft-ietf-ccamp-inter-domain-pd-path-comp-00.txt JP • GMPLS Addressing (10 mins) draft-ietf-ccamp-gmpls-addressing-01.txt Richard • ASON/GMPLS Lexicography (10 mins) draft-ietf-ccamp-gmpls-ason-lexicography-03.txt Igor • ASON routing evaluation (5 mins) draft-ietf-ccamp-gmpls-ason-routing-eval-01.txt Dimitri • ASON signaling (5 mins) draft-ietf-ccamp-gmpls-rsvp-te-ason-03.txt Dimitri 63rd IETF Paris August 2005
Agenda (2 of 2) • Working Group Work Plan • Options for progress (5 mins) Adrian and Kireeti • Potential new work (15 mins) Adrian and Kireeti • Charter discussion (15 mins)Alex, Bill, Adrian and Kireeti • Layer Two Switching • Framework (10 mins) draft-papadimitriou-ccamp-gmpls-ethernet-framework-00.txt Dimitri • Next steps (10 minutes) Adrian and Kireeti • Other drafts • Advertising node TE capabilities (5 mins) draft-vasseur-ccamp-te-node-cap draft-vasseur-ccamp-automesh JP • Advanced constraints • draft-otani-ccamp-gmpls-cspf-constraints (5 mins) Tomohiro • draft-ashwood-ccamp-gmpls-constraint-reqts-00.txt (5 mins) Don • VCAT/LCAS • draft-bernstein-ccamp-gmpls-vcat-lcas-00.txt (5 mins) Greg • draft-imajuku-ccamp-gmpls-vcat-lagr-req-00.txt (5 mins) Wataru 63rd IETF Paris August 2005
Draft Status – Beyond the Working Group • One new RFC • RFC 4139 • Requirements for Generalized MPLS (GMPLS) Signaling Usage and Extensions for Automatically Switched Optical Network (ASON) • Thirteen drafts in the RFC Editor’s Queue • Increase of two since last time • Not one is blocked by a reference – just waiting for the Editor • Eight drafts with AD for review • Increase of six since last time • Three drafts waiting for MIB Doctor review • Increase in three since last time 63rd IETF Paris August 2005
Draft Status – Still with the Working Group • Completed WG last call on eight drafts • Nine active Working Group draft remain • Six new WG drafts since last time • GMPLS Addressing • GMPLS ASON Lexicography • ASON Routing Evaluation • LSP Stitching • Inter-domain RSVP-TE • Per-domain Path Computation • Two marked up after WG last call need chair’s sign-off • RSVP Restart Extensions • RSVP Exclude Route • One draft still active from before • ASON Signaling • Individual status reports will show that most drafts are cooked. 63rd IETF Paris August 2005
Charter Milestones • MIB milestone completed since last time. • One milestone remains Mar 04 Submit revised charter and milestones to IESG for IESG consideration of more detailed deliverables and determination of usefulness of continuation of WG • Full discussion later in this meeting 63rd IETF Paris August 2005