50 likes | 176 Views
ITU-T Study Group 15 Communications to IETF CCAMP Working Group. Lyndon Ong & Jonathan Sadler on behalf of Wesam Alanqar ITU-T SG15 Representative to IETF CCAMP LyOng@Ciena.com & Jonathan.Sadler@tellabs.com. Thanks to CCAMP.
E N D
ITU-T Study Group 15 Communications toIETF CCAMP Working Group Lyndon Ong & Jonathan Sadler on behalf of Wesam Alanqar ITU-T SG15 Representative to IETF CCAMP LyOng@Ciena.com & Jonathan.Sadler@tellabs.com
Thanks to CCAMP • SG15 Q14 thanks CCAMP WG’s Liaison statement on the creation of a Design Team on GMPLS ASON Routing Solutions • SG15 Q14 thanks CCAMP WG’s Liaison statement on GMPLS MIB modules • SG15 Q14 thanks CCAMP WG co-Chair Mr. Adrian Farrel for attending the Q14 Berlin meeting and providing valuable insight and feedback • SG15 Q14 looks forward to productive collaboration on future ASON protocol development
ITU-T SG15 Activities • Signaling • Continuing to discuss ways of converging signaling with IETF work – no conclusions yet • Routing • Reviewed Ciena contribution with summary of points discussed within the IETF Routing Solutions Design Team • Suggestions to be brought back to the RSDT by Team members
ITU-T SG15 Activities • Management • Reviewed liaison from CCAMP on GMPLS MIB work • High level review of MIB documents • Minor comments, further review planned between now and next SG15 meeting (29 November – 3 December 2004)
Location of Relevant Information • ftp://sg15opticalt:otxchange@ftp.itu.int/tsg15opticaltransport/COMMUNICATIONS/index.html • http://www.ietf.org/iesg/liaison.html