1 / 5

ITU-T Study Group 15 Communications to IETF CCAMP Working Group

ITU-T Study Group 15 Communications to IETF CCAMP Working Group. Lyndon Ong & Jonathan Sadler on behalf of Wesam Alanqar ITU-T SG15 Representative to IETF CCAMP LyOng@Ciena.com & Jonathan.Sadler@tellabs.com. Thanks to CCAMP.

shanta
Download Presentation

ITU-T Study Group 15 Communications to IETF CCAMP Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ITU-T Study Group 15 Communications toIETF CCAMP Working Group Lyndon Ong & Jonathan Sadler on behalf of Wesam Alanqar ITU-T SG15 Representative to IETF CCAMP LyOng@Ciena.com & Jonathan.Sadler@tellabs.com

  2. Thanks to CCAMP • SG15 Q14 thanks CCAMP WG’s Liaison statement on the creation of a Design Team on GMPLS ASON Routing Solutions • SG15 Q14 thanks CCAMP WG’s Liaison statement on GMPLS MIB modules • SG15 Q14 thanks CCAMP WG co-Chair Mr. Adrian Farrel for attending the Q14 Berlin meeting and providing valuable insight and feedback • SG15 Q14 looks forward to productive collaboration on future ASON protocol development

  3. ITU-T SG15 Activities • Signaling • Continuing to discuss ways of converging signaling with IETF work – no conclusions yet • Routing • Reviewed Ciena contribution with summary of points discussed within the IETF Routing Solutions Design Team • Suggestions to be brought back to the RSDT by Team members

  4. ITU-T SG15 Activities • Management • Reviewed liaison from CCAMP on GMPLS MIB work • High level review of MIB documents • Minor comments, further review planned between now and next SG15 meeting (29 November – 3 December 2004)

  5. Location of Relevant Information • ftp://sg15opticalt:otxchange@ftp.itu.int/tsg15opticaltransport/COMMUNICATIONS/index.html • http://www.ietf.org/iesg/liaison.html

More Related