190 likes | 373 Views
BIM -- Berthing Impact Monitoring. Why Monitor B erthing Impacts. ?. Two Types of Impacts. BIM Principle - General. BIM System Structure. P yramid S tructure System. BIM System Schematics. Mechanical Design & Installation. BIM Principle – Impact Energy Amplitude.
E N D
BIM System Structure Pyramid Structure System
BIM Principle – Impact Energy Amplitude • Es = 1/2 M x V^2 x Ce x Cm x Cs x Cc • Whereas • M: ship loaded mass • V: MEASURED ship berthing configuration velocity Vix • Ce: ship eccentric coefficient • Cm: ship mass coefficient • Cs: ship softness coefficient • Cc: berth configuration factor
BIM Development TeamJohnny Qiu – Author, Original Concept / Functionality / GUI Design Wei Yu – Co-author, System Design, Software ProgrammingGuoping Tang – Hardware & Mechanical Design • Weimin Xia – Software ProgrammingCuiping Jin – Fender Integration Design • COPRI / PIANC PORTS 2013 PIANC Smart River 2013 • Aug. 25-Aug. 28. 2013 Sept. 26, 2013 ( Paper No. 193 ) • Sheraton Seattle Hotel Palais des Congrès • 1400 Sixth Avenue Esplanade de l'Europe 2/A, 4020 • Seattle, WA 98101, USA Liege, Belgium Contact Information • Zalda Technology • Integrated Solutions for Berthing, Fendering, and Mooring 2488 Technology Dr.Hayward, CA 94545-4867T. +1 510-783-4910F. +1 510-783-1897W. www.zaldatechnology.com/BIM.html • E. zaldausa@zaldatechnology.com ThankYou !