Sector Test Beam 2 - Dispersion, Matching

Sector Test Beam 2 - Dispersion, Matching. Dispersion Measured with frequency trims on the LHC frequency → SPS frequency at flat top coupled Maximum possible frequency trims +/- 2.4 kHz: dp/p +/- 3 permille Weekend 8/9 of August only +/- 800 Hz possible. ...re-phasing worked.

Download Presentation

Sector Test Beam 2 - Dispersion, Matching

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sector Test Beam 2 - Dispersion, Matching • Dispersion • Measured with frequency trims on the LHC frequency → SPS frequency at flat top coupled • Maximum possible frequency trims +/- 2.4 kHz: dp/p +/- 3 permille • Weekend 8/9 of August only +/- 800 Hz possible ...re-phasing worked...

  2. Dispersion 23 (1) • Changes of polarity of the odd QTLs solved point 3 issue, measured also IR3 (TCSG.5L3.B1 was out) • Less good in the arc now... Results from weekend 8/9 of August

  3. Dispersion 23 (2) Results from weekend 23/24 of August

  4. Matching with Screens (Sector 87) • Not fully analysed yet • Can load optics with file... • (including tilt in LHC)