1 / 27

Application of Asset Management Principles During Asset Creation and Design

Application of Asset Management Principles During Asset Creation and Design. Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management Seminar September 17, 2003. “ Asset management is a structured approach to delivering desired service levels at lowest life cycle costs”.

thi
Download Presentation

Application of Asset Management Principles During Asset Creation and Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Application of Asset ManagementPrinciples During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay SectionAsset Management Seminar September 17, 2003

  2. “Asset management is a structured approach to delivering desired service levels at lowest life cycle costs” What is Asset Management? A simple definition!

  3. My Focus Ken’s Focus Life Cycle of an Asset Plan / Create Acquire Maintain Refurbish Replace

  4. Representation will Focus on Two Key Topics • Business Case Evaluation: A powerful process for validation Capital Investments • Incorporating Asset Management into design

  5. Business Case Evaluation:A Powerful Process for Validating Capital Investments

  6. What is Business Case Evaluation (BCE)? • BCE is a rigorous analytical process for validating capital investments • For optimum value it is initiated at the early planning stages — but it must “live” as the project proceeds • It repeatedly revisits the drivers for a project • It validates the need for a solution in terms of customer value • It seeks the lowest life cycle cost solution consistent with risk • And most important… It involves owner's cross-functional staff

  7. BCE Focuses on the Following Questions • What is the objective of the project? • Does the project do more than required to satisfy the desired function? • Does it cost more than it is worth in terms of benefits? • Are there other ways of doing it? • What are impacts and benefits to customer?

  8. BCE Example • Existing interceptor was surcharging in heavy rains, causing upstream spills • Client planned a new 36” relief interceptor with pump station midway • 30% design completed, RFP for final design was about to be issued • Capital cost was $13.8 million • Running costs averaged $167K/year (2003 dollars) • Total PV of ownership costs (50 years) was $17.5 million

  9. The BCE Team Goes to Work… • Client established a BCE Team from Engineering and Field O&M • The team defined 15 alternative approaches! • Several were “fatal flawed” out but seven remained • Timing, capital costs, O&M costs, and refurbishment costs were estimated for each of the seven

  10. BCE Results • Team determined need to eliminate existing surcharging was valid • Four new alternatives were cheaper than the planned approach • Project concept changed from pipe and pump station to simple gravity pipe • Required lowering the receiving interceptor by several feet

  11. BCE Benefits are Substantial! • Capital cost was $3 million lower • Total 50-year ownership cost was $7.5 million lower – a 40% savings • Project risk profile was improved • Project could be in place a year sooner!

  12. Asset Ownership: Some Valuable lessons • Asset ownership costs are forever • O&M costs are bigger than generally perceived • On-going capital refurbishment costs are often ignored • The point being…Total costs of Asset ownership are difficult to identify and usually underestimated

  13. BCE is a Powerful Process for Validating Capital Investments • Once initiated projects tend to take a life of their own – BCE repeatedly refocuses on basic drivers • It engages utility staff responsible for asset ownership and O&M • It is much more rigorous in establishing true costs of asset ownership than typical economic analysis • It is a process — not a singular event (e.g. VE) – a project can be modified, deferred, or killed at any phase

  14. Incorporating Asset Management Principals in Designs

  15. Agenda • Asset Management context • Steps to take during design • Current applications

  16. Initiating Asset Management Concepts During Design Process has Multiple Benefits • Builds asset framework that can be continued during construction and on into operations • Develops performance indicators at the outset • Provides basis for consistent tracking of asset improvements over time • Helps successfully implement process control and maintenance management systems

  17. Understanding Asset Life Cycle Helps Optimize Ownership Costs

  18. Asset Management Concepts Extend From Design Through Operations

  19. Key Asset Management Steps During Design • Develop asset hierarchy • Establish performance measures • Define interfaces during process design • Coordinate O&M elements with the design

  20. Process Develop Asset Hierarchy Structure to Link Information for Key Stakeholders • Inventorynew andexisting assetsassociated withthe designproject • Organize allassets into a structured hierarchy • Develop a common asset identification structure • Start establishing an asset plan for each asset class and component • Require bid and final pay documents to establish costs at the same level of asset detail

  21. Establish Performance Measures to Track Assets Against Stated Objectives • Identify units and measures of information needed to analyze future asset performance • Define condition assessment parameters • Define data-recording requirements and reporting needs

  22. Future Replacement Decisions Can Be Made More Efficiently

  23. Defining Interfaces During Design Process Helps Measure Asset Performance Over its Lifecycle • Process control system should accommodate asset management objectives and P&IDs should be consistent • Equipment data sheets should follow asset hierarchies and incorporate performance data • Lay out information systems and databases to be compatible with hierarchies and equipment numbering

  24. Coordinating O&M Elements with Design Results in Significant Cost Savings • Link draft O&M manuals with asset management concepts • Asset management framework should guide maintenance management system development • O&M documents should incorporate performance measures developed during design

  25. Location Orange County Water District, CA Where Are These Asset Management Concepts Being Applied? Project Large new reclamation plant King County, WA Large new wastewater treatment plant Expansion of mid-size wastewater treatment plant City of Hayword, CA Gwinnett County, GA Program management for multiple water and wastewater projects

  26. Summary • Asset management concepts can be incorporated through some simple yet important enhancements to the traditional design process • This approach can save time and money by not having to recreate data bases and systems • The asset management approach can be beneficial for projects of all types and sizes

  27. Questions and Discussion

More Related