Tom Touralias, P.Eng., MBA Director of Engineering & Infrastructure Services. 2012 CAPITAL PROJECTS. PUBLIC WORKS. Rourke Line – Phase 2 Full urban reconstruction / drain enclosure $4.5 million Shoreline Road Full urban reconstruction $1.4 million Notre Dame Revitalization – Phase 1
E N D
Tom Touralias, P.Eng., MBADirector of Engineering & Infrastructure Services 2012 CAPITAL PROJECTS
Rourke Line – Phase 2 • Full urban reconstruction / drain enclosure • $4.5 million • Shoreline Road • Full urban reconstruction • $1.4 million • Notre Dame Revitalization – Phase 1 • Finalize Class EA & Design / Utility relocation • $500,000
First Street Storm Pump Station • $750,000 • Sidewalk Repair and New Construction • $350,000 • Trails and multi-use paths • $365,00
BRIDGE REHABILITATIONS VARIOUS LOCATIONS $279,000
CONVERSION OF GRAVEL TO SURFACE TREATED ROADS $269,000
St. Mary’s / Faith Drive • 6” & 12” cast iron watermain replacement • $750,000 • County Rd. 22 / Puce River • 24” crossing of Puce River • $450,000 • Rourke Line • 24” feedermain to future water tower • $600,000
Belle River Water Tower Replacement • 1.25 MIG • Finalize Class EA and Design only • Propose to construct in 2013
Lakeshore Eastern Communities Wastewater Servicing ESR • Commenced in early 2010 • Completion Spring 2012 • Stoney Point, Comber, Lighthouse Cove & Rochester Shoreline • Inflow & Infiltration Reduction Program • $300,000
Multi-Use Recreation Facility • Design underway (MJMA Architects) • Ice Rinks (2 or 3 tbd) • Gymnasium • Library • Multi-use space • Internal walking track • Tender Spring 2012 / Completion Spring 2014 • Provincial Grant: $17 million • Facility Estimate: $35 - $40 million