50 likes | 170 Views
UES Measure Sunsets. Regional Technical Forum January 22, 2014. UES Measure Sunsets. Need to extend sunset date for Under Review UES: Air Source Heat Pump Upgrades – MH Reasons: Waiting on SEEM calibration for MH Expected: 7/31/14
E N D
UES Measure Sunsets Regional Technical Forum January 22, 2014
UES Measure Sunsets • Need to extend sunset date for Under Review UES: Air Source Heat Pump Upgrades – MH • Reasons: • Waiting on SEEM calibration for MH • Expected: 7/31/14 • All other MH measure sunset dates have been moved to July since they are related
UES Measure Sunsets I ___________ move that the RTF extend the sunset date of Air Source Heat Pump Upgrades - MH to 7/31/14.
UES Measure Sunsets • Propose to deacivate the Out-of-Compliance UES: Grocery – RTU Supply Fan VFDs • Reasons: • Lack of Interest: No research plan has been developed and no planned research on the horizon • Necessary research would be complex and expensive • Outdated: The measure, as currently based, is not as good as other available technologies (VFD only) • Limited Eligibility: Measure application is for small to midsize systems (10 HP maximum) and many grocery stores have fan systems much larger
UES Measure Sunsets I ___________ move that the RTF deactivate the Grocery - Rooftop Unit Supply Fan VFDs UES measure.