1 / 14

Basket Centrifuge (BCF-101) in the Insulin Production Process

Basket Centrifuge (BCF-101) in the Insulin Production Process. Alexander Lai, Dominic Watson & Karthik Rajendiran . Location in the process. Purpose of this step. Removal of undesired chemicals Ammonium Acetate, Acetic Acid and Zinc Chloride Dewatering $$ Savings in Freeze Drying Stage.

thu
Download Presentation

Basket Centrifuge (BCF-101) in the Insulin Production Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Basket Centrifuge (BCF-101) in the Insulin Production Process Alexander Lai, Dominic Watson & Karthik Rajendiran

  2. Location in the process

  3. Purpose of this step • Removal of undesired chemicals • Ammonium Acetate, Acetic Acid and Zinc Chloride • Dewatering • $$ Savings in Freeze Drying Stage

  4. Alternatives? • Cyclone Separator (Hydroclone) • Tubular Bowl Centrifuge

  5. Schematic of Perforated Basket Centrifuge with Automatic Discharge

  6. Performance Metrics • Capacity / Max Throughput (L/min) • Solids Recovery (%) • Protein Yield (%) Photo: NASA Photo: Novo Nordisk Photo: Gregory Smutzer

  7. Process Parameters • RPM • Temperature • Feed Rate • Solids Concentration in Feed

  8. Essence of Centrifuge Design Efficiency Capital Cost Utilities Use Throughput Downtime

  9. Centrifuge Design Basis: Batch Cake Volume = 12.78 m3 • Pressure  P = Pa + 0.5L2(R2 – R2p) • G- Force  G = n2aΩ2R

  10. Materials of Construction • 5 materials were investigated • Carbon Steel • Stainless Steel • Rubber lined Steel • Bronze • Monel

  11. Cost • Area = 0.738m2 • Unfactored cost = $55,000 • M&S 2007 Index, Location and Material Factored cost = $146,000

  12. Mitsubishi HZ70L-Si

  13. Questions??

More Related